Browse
Search
Agenda - 11-11-2002-4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:44:49 AM
Creation date
8/29/2008 11:13:06 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/+} <br />,P.' <br />The Board has previously approved the composition of the architect selection committee. the <br />two planning committees (interior antl exterior) antl the development process proposed for the <br />Justice Facilities Expansion. However determination of a design preference, particularly as it <br />respects [he parldrgieciltlies will be requiretl at such time the Boartl is preparetl to proceetl <br />fuRher with the expansion Initiatives. As a reminder, parking options itlentifetl e[ this time <br />include: <br />i. Packing facilides Integratetl into each phase of courthouse expansion, beginning <br />with the Phase I I (Phase I inclutles only untlergrountl securetl parking for lutliciel <br />offciels antl was referencetl as Op[icn B in the original master plan report). <br />2. Separate parking deck sduatetl in Ne approximate location of the existing Sheriffs <br />office. (Referencetl as Option A in the original master plan epoR. Commissioners <br />have previously supportetl leaving Ne Sheriffs builtling intact antl no[ placing a <br />free-scantling deck on this site.) <br />3. Saperem palling tleck scuatetl in the approximate location of the existing <br />Government Services Center Annex perking lot (Includetl In the expeMetl master <br />plan.) <br />FINANCIAL IMPACT: The BOartl may recall that funtls for planning the project are available in <br />the 2001-2011 Capital Investrnent Plan. The proposetl 2002-2012 CIP inclutles footling via <br />altemetive financing for Phase I constmalon as c was originally proposetl. <br />RECOMMENDATION(S): The Manager recommentls that the BoaN receive the information <br />antl provide tlirection to staff as may be appropriate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.