Orange County NC Website
/+} <br />,P.' <br />The Board has previously approved the composition of the architect selection committee. the <br />two planning committees (interior antl exterior) antl the development process proposed for the <br />Justice Facilities Expansion. However determination of a design preference, particularly as it <br />respects [he parldrgieciltlies will be requiretl at such time the Boartl is preparetl to proceetl <br />fuRher with the expansion Initiatives. As a reminder, parking options itlentifetl e[ this time <br />include: <br />i. Packing facilides Integratetl into each phase of courthouse expansion, beginning <br />with the Phase I I (Phase I inclutles only untlergrountl securetl parking for lutliciel <br />offciels antl was referencetl as Op[icn B in the original master plan report). <br />2. Separate parking deck sduatetl in Ne approximate location of the existing Sheriffs <br />office. (Referencetl as Option A in the original master plan epoR. Commissioners <br />have previously supportetl leaving Ne Sheriffs builtling intact antl no[ placing a <br />free-scantling deck on this site.) <br />3. Saperem palling tleck scuatetl in the approximate location of the existing <br />Government Services Center Annex perking lot (Includetl In the expeMetl master <br />plan.) <br />FINANCIAL IMPACT: The BOartl may recall that funtls for planning the project are available in <br />the 2001-2011 Capital Investrnent Plan. The proposetl 2002-2012 CIP inclutles footling via <br />altemetive financing for Phase I constmalon as c was originally proposetl. <br />RECOMMENDATION(S): The Manager recommentls that the BoaN receive the information <br />antl provide tlirection to staff as may be appropriate. <br />