Orange County NC Website
nraa unve2 <br />Litlle Rlver Reoipnal Park (8342 000 Grenl-funtletl Count P-I-L funtl 1 <br />1. Durham antl Orange County review tlratt concept plan (from consultant) <br />2 LiXle River Park Atlvisory Commll[ee reviews tlraR concept plan, and <br />recommentls to the BoaNS of Commissioners in Durham and Orange <br />Counties <br />3. BoaNs review and approve concept plan <br />4. Inierlocal agreement reviewed antl approved regartling operation and <br />aintenance of park <br />5. Bids solicited for cens[mction of park, approved by BoaN of Commissioners <br />6. Volunteers and non-pro0is work to tlevelop and fnallze trails a[park <br />]. PaB constmction begins spring 2003, and opens to public in Fall 2003. <br />Cha IHIIIT h' P k tlEtl t' IC <br />($t 2 "II' f h I f k 2001 k b dl <br />7. 23-member Master Plan Work Group charged and appointeq began work on <br />9-30-02 <br />2 Exact type of school campus facilities yet to be tletennined <br />3. Work Group visits other padJcempuaea-November-pecember 2002 <br />4. Interim repod to Board of Commissioners in early 2003 <br />5. Master Plan to be completed in May 2003 (less tletail on etlucational campus) <br />6. Boartl review of Master Plan -June-September 2003 <br />]. Town of Carrboro review antl approval process -May 2003 -April 2004 <br />S. Ccnsirudicn drawings developetl-March-May 2004 <br />9. Consimction bids approvetl by Boartl-September 201)4 <br />10. Constmction of Perk (phase I) -October 2004 -September 2005 (tlepentling <br />on scale of project) <br />1 f. Perk (phase I) opens October 2005 <br />McGowan Creek PrcservelSfifi 000 199] k b tl fh 1 <br />1. Topographic survey and sRe plan preparetl <br />2. OOT requested to atltlress tum lane <br />3. Board considers site plan forfacility (October 2002) <br />4. Construction Spring 2003 (with volunteers tloing trail cens[mction) - <br />MCGOwan Creek Preserve opens for use FaIINJinter 2003 <br />Maple V'aw Soccer F'eltl ($9fi 000 199] Park B tllOfh 1 <br />1. Survey and lease completed <br />2 Fieltl tlesign sde plan developed by Open Space Design Specialist <br />3. Owners have reviewetl antl approved site plan <br />4. Public presentation and consideration of site plan (October-November 2002) <br />5. eitls forfeld construction developed and approvatl (December 2002) <br />6. Consimction offeltl(January-September 20W) <br />]. Field open far use (October-November, 2003) <br />