Orange County NC Website
Draft lull/02 <br />Project Name: Fairview Park <br />Project Cost: 850 000 <br />Pre-COncepl Plan Completed? No <br />ProjeN Stalus'. Existing playground antl playing Treld. Decisions needed on 1) <br />whether perk will include 6olh County antl Town of Hillsborough portions or <br />County only, 2) whether a joint Covnty/lown perk or a County park, and 3f <br />whether park plan will be folded into master plan for other public (acilRies at site. <br />Funds fipm 2001 6onq appmpriatetl accordingly in 2002-2012 CIP, consistent <br />with rollowing timetable. There is no preconcept plaNCOncept plan. Meeting <br />being scheduletl6etween Countyand Town representatives to tliscuss issues. <br />3CGPF GF WOXx: Discuss outstanding issues with Town o(Hlllsborough. <br />Develop pre-concept plan. Form concept plan commrBee to tlesign park antl any <br />overell (ecllQg usingpre<onceptolan and opereting principles atlopted as part of <br />me char e b the Board o <br />a p'Tt' 1' "", <br />=Rarltlef3'+ I •-- f Commrssroners. <br />$11 500 (for tletailed topographic end location surve <br />Town of Hillsborough? <br />F'WIMiaW aB Commiss oner Jacobs <br />4+A 9q{, Fj(~a'C+pmplltteE. Commiss oner Halklotls <br />r <br />#. <br />lf <br />pll <br />j <br />j~ 1 Hillsborough Town Commissioner <br />10C Recreation and Parks Atlvisory Council member <br />y <br />~ <br />l{ <br />_ <br />~ <br />_ <br />I I r 1COmm ss on ror the EnvirOnmen[member <br />U <br />II: Area Cdizans <br />~ lcitlzen tlesign professional) other expertise <br /> Additional members ila Master Plen Work Grou ~ <br />t(Respu[yee ~ I prmary: County Manager (or tlesignee), Open Space <br /> Design Specialist, ERC Director, Recreation antl <br /> Parks Management Director <br /> <br />.'' Other (also primary if Master Plan approach <br />U1 selectetl}. Lantl Conservation Manager, County <br />1~- ) Engineer, Planning Director (County and Town), <br /> Pmchasin Director, Publlc Works Director <br />TowNCOUnry Work Group (Process): Dammber 2002-Fehruarv 2D03 <br />BOCC Approval of SCOpe NProjec(: MarchJUne 2003 <br />Projected Concept Plan Tmmetable` JuIV 20113-AOa120o4 <br />Target Date BOCC?own Consideration". Mav-AUous12o04 <br />'-AS per curteM pmpwetl acM1Ctlule. <br />