Orange County NC Website
Draft 11111102 <br />1. Deveivp construction draminge and deuelvp RFP (or bldg <br />3. Present cvnatruarivn. drawingaw Rovrd of Carnrniaeivn~a <br />3. Submit plans jor npyrnval(S[fe Pdan Approval-Plan.nine sw/f) <br />a Svliait u.d rriiew 6ida <br />o. Awmrd bid Eo mntraatvr/s) <br />serrv'. Commissioner Carey <br /> County Manager (or designee) <br /> Recreation and Perks Management Director <br /> Purchasing Director <br /> Open Space Design Specialist <br /> ERC Director <br /> I County Engineer <br />~! Planning Dirador <br />k,< Park Services Director <br />t=~~. ` (Concept Plan Review Work Group kept apprised of <br /> <br />Of "'lpn D' wm s ~i ri October 2003 <br />"rovai ' Oecember 2003 <br />sIFA& ckpa Re fns •~. Janus 2004 <br />2p~V~+a".~~~,'f M~~i grGlPmiu~e k iT', i ~' <br />' -Opening date estimate depends on whet facilities are to be built <br />r~a?keded k P+«eeG ar rba 7m~e: <br />If the Baartl is ready to proceed with planning for this park: <br />1. Create Egand-Cheeks Park Plan Review Work Group, [o review [he <br />existing concept plan for the park for adequacy and changed <br />conditions, and amend as naedetl. Review letter from existing <br />wmmunlty group about Involvement. <br />2. Adopt operating principles and charge for Work Group, as needed. <br />