Browse
Search
Agenda - 11-11-2002 - 3c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002 - 3c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:45:19 AM
Creation date
8/29/2008 11:13:05 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Document Type
Agenda
Agenda Item
3c
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft 11111102 <br />1. Deveivp construction draminge and deuelvp RFP (or bldg <br />3. Present cvnatruarivn. drawingaw Rovrd of Carnrniaeivn~a <br />3. Submit plans jor npyrnval(S[fe Pdan Approval-Plan.nine sw/f) <br />a Svliait u.d rriiew 6ida <br />o. Awmrd bid Eo mntraatvr/s) <br />serrv'. Commissioner Carey <br /> County Manager (or designee) <br /> Recreation and Perks Management Director <br /> Purchasing Director <br /> Open Space Design Specialist <br /> ERC Director <br /> I County Engineer <br />~! Planning Dirador <br />k,< Park Services Director <br />t=~~. ` (Concept Plan Review Work Group kept apprised of <br /> <br />Of "'lpn D' wm s ~i ri October 2003 <br />"rovai ' Oecember 2003 <br />sIFA& ckpa Re fns •~. Janus 2004 <br />2p~V~+a".~~~,'f M~~i grGlPmiu~e k iT', i ~' <br />' -Opening date estimate depends on whet facilities are to be built <br />r~a?keded k P+«eeG ar rba 7m~e: <br />If the Baartl is ready to proceed with planning for this park: <br />1. Create Egand-Cheeks Park Plan Review Work Group, [o review [he <br />existing concept plan for the park for adequacy and changed <br />conditions, and amend as naedetl. Review letter from existing <br />wmmunlty group about Involvement. <br />2. Adopt operating principles and charge for Work Group, as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.