Orange County NC Website
z <br />the spirit of public input and communication, letters have been sent to property owners near <br />the field, apprising them o1 the oppprtuniry to view [he presentation of the site design. <br />Once the site plan is approved by the Planning Department, bids would be solicited for <br />projac[wns[ructlon. <br />BXe Plena roved Plannin Late-November 2o02 <br />Blds solicited and awarded Late~November-December 2002 <br />Constmc[ion - January-Ma¢h 2003 (weather <br />emtinin <br />Fialtl r March-October 2003 <br />O en for ose hest-case October 2003 ~zt earliest <br />Staff recommends that the field be planted with Bermuda grass surface, installed in a fashion <br />similar to this summers held remedation at Egand-Cheeks Park. This surface would require <br />the full summer/fall 2003 growing season (June-October) to become ready for play in <br />October 2003. at the earliest. It is possible that the held might not be ready for use until <br />2004. If an altema[Ne sod surface is purchased end inslalletl instead it could expedite the <br />opening of [he field to the summer of 2003 (but this would increase the total cost of Me <br />protect as shown below). It should be noted Chap rf cons[mction la delayed beyond winter <br />2002-03 or if it extends into spring 2003, a eermutla-seeded field would not be ready for use <br />until spring/summer 2004. <br />Af fbe October 15 special presentation, staff was asked to explore several issues. The <br />attached memorandum addresses these questions and issues, end includes a vicinity map, a <br />revised sde design. and minutes fmm a meeting of (he Orange Courrty Soccer Alliance <br />(OCSA). In summary, the memo proposes: <br />Y That entry egos and interior signage be developed <br />That a "carryaNCerry-out"approach be hied for fresh and recycling at the site <br />i That °POrte-Pot's"be used at the slte as opposed (o instellatlon o1 rustle Collets <br />L That discussions continue 6efween the County and OCSA on the nature and role o! their <br />partlcipetion in constmdmn and mainenance of the fie/d, to 6e resolved by the time o(bid <br />award and construction <br />Y That the no lighting"provision be enforced via a site plan condRRion ofappmval <br />r That the Planning Department is developing an estimate of vehicle fdps per day fo the <br />sne, and that DOT 6e asked fo install °Children P/eying"signs along Rocky Ridge Roatl, <br />and <br />Atltlitional screening be installed as proposed along the northern boundary o/the sde <br />On a related note /mm the October 15w meeting, conversation is continuing with OCSA on <br />what rok the organizafion should or would play in [he field constuction or operetun and <br />maintenance. Sleff proposes that conversations continue on these points, with a defindive <br />statement fo be developed by the time consWCYion bids ere considered in December <br />FINANCIAL IMPACT: Once [he Board approves the site design, and the site plan is <br />approved by the Planning Department, constmcion drawings would be prepared and the <br />project would be ready for bid The total cost of construction for the field is estimatatl at $]5- <br />100,000. Purchasing and installing a sad surtaca would cost an estimatatl additional $20- <br />