Browse
Search
Agenda - 11-11-2002 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 4:04:40 PM
Creation date
8/29/2008 11:13:02 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br /> Is her d tt ( g ho I Yes the site Is near Coml Elementary Sch I <br /> 4th Indf oriented ti t . bl and VP P' I the me 01 d b(C uid l ds Ind <br /> en wic <br /> n rally sunixtre I d ) WA No active excreation recreation proposed. The silo would not 6 itable for active <br /> ramethation due to t comdar and ni area <br /> Will the ucyuishon Judi purldoes of Upl Em and N hope Comae mervium inhere;(if at 'wble)9WA- <br /> 6ut the acguistion will furMef eMUfs ro add to Me Bolin Creek comtlor(which Is part ofJOmen Lake <br /> waterahed). <br /> ty pwsn(lira pur91ion)to Neproposed afM opk podeesilympowPl[sLad4 POten(lally yea.AOOe93 4VUltl be <br /> omplemot through adjacent Wilson Pads eliminating illegal palling along Estes Drive Extension, which <br /> now occurs <br /> Conclusion <br /> As shown above, the proposal meets most of the criteria for joint parks and open <br /> space projects, but does not meet all. For example, the primary criterion calling <br /> for a 50% match by the requesting local government is not met. However, other <br /> important voters, such as the protection of identified Natural Heritage sites, are <br /> met. <br /> As a land acquisition project, this project is not applicable ad the IP Work Group's <br /> recently-recommended policy ("Planning Process for Joint County/Town Open <br /> Space Projects"), although some provisions of that document may be prudent to <br /> apply, such as the appointment of a County/Town Project Planning Group(PPG) <br /> to oversee the acquisition activities. Additionally, once a policy governing joint <br /> facilities projects Is adopted, that policy would govern eventual greenway <br /> extension along this Corridor(and through this property), If pursued as ajoint <br /> County/Town project. <br /> The Town's request in May of Nis year was for $500,000, with a more-recent <br /> refinement asking that the Town's full portion of the 2001 bond funds for <br /> greenways ($750,000) be used to this end. <br /> The acquisition of his tract would further the expansion of the Bolin Crack <br /> Greenway, by providing land along the Master Plan route that could be <br /> incorporated into the greenway. Clarification is needed that the greenway could <br /> be placed on this side of Bolin Creek, as the existing Town plans show the <br /> Proposed greenway, on Ne opposite side of the creek. However, this is merely a <br /> line on a map and there Is no design for the greenway at this time. <br /> While construction of the remainder of the greenway N the Adams Tract: may be <br /> some years in the offing, greenway segments are often acquired in piecemeal <br /> fashion as part of a master plan. Acquisition of Me Adams Tract would enhance <br /> that goal, by acquiring land for the eventual extension of Bolin Creek Greenway, <br /> which would also eventually tie to trails proposed on the Chapel Hill Township <br /> toonentrosandRievuree Con rvatiar <br /> PO Box 81811306-A Revorn Road <br /> HillsMqu9h,NC 2727B <br /> (919f 205-2590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.