Orange County NC Website
Early Action Compact Requirements Local, State and the EPA Commitments <br /> Local Areas <br /> Local areas hold primary responsibility for the development and implementation of the <br /> local control measures, as well as for maintaining communication with all parties, <br /> including: <br /> • Participate with State in drawing up the Compact, which embodies the requirements <br /> described in Sections A-F, including a time line for milestones. <br /> • Completing and signing by all parties of the Early Action Compact no later than <br /> December 31, 2002. <br /> • Completing and adopting the local measures of the early action plan so that these can <br /> be included as part of the SIP no later than December 31, 2004. <br /> • Notifying parties as soon as possible of issues and developments, which may impact <br /> performance and progress toward milestones. <br /> • _ Notifying parties as soon as possible if Compact milestones will be missed or have <br /> been missed. <br /> • Notifying parties as soon as possible if Compact modification/termination is to be <br /> requested. <br /> State <br /> The state will assist in the drafting of the Early Action Compact and will provide support <br /> to areas throughout the planning and implementation process, including: <br /> • Development of emission inventories, modeling process, trend analysis and <br /> quantification and comparison of control measures; <br /> • Necessary information on all Federal and State adopted emission reduction measures <br /> which affect the area; <br /> • Technical and strategic assistance, as appropriate, in the selection and implementation <br /> of control strategies; <br /> • Technical and planning assistance in developing and implementing processes to <br /> address the impact of emissions growth beyond the attainment date; <br /> • Maintenance of monitors and reporting and analysis of monitoring data; <br /> • Support for public education efforts; <br /> • Coordinate communication between local areas and the EPA to facilitate continuing <br /> the EPA review of local work; <br /> • Expeditious review of the locally developed plan, and if deemed adequate, propose <br /> modification of the SIP to adopt the early action plan; <br /> • Adoption of control measures into the SIP as expeditiously as possible. The final <br /> complete SIP revision must be completed, adopted, and submitted by the state to the <br /> EPA by 2004. <br /> EPA <br /> The EPA will recognize the local area's and State's commitment to voluntarily adopt an <br /> early, substantive, enforceable and scientifically-based attainment plan with early <br /> implementation of control measures by becoming a party to the Early Action Compact <br /> developed in conformance with this protocol. <br />