Orange County NC Website
Project Summary <br /> The Southern Community Park Conceptual some of the major concerns raised in the <br /> Plan Committee has developed a proposed planning process: <br /> conceptual plan for the 70- acre property <br /> that we believe would meet many of the Preservation of Open Space <br /> community's parks and recreation related <br /> needs while preserving significant portions of About 60-70%of this site would be left as <br /> Dog- <br /> the site as open space. open space. Most of the site south of Dog- <br /> wood Acres Drive would remain undis- <br /> The Committee met from February until turbed. Woodland trails would provide <br /> September 2001 and considered a wide range access to these natural areas.Large buffers <br /> of information including: would protect neighbors,the Highway 15- <br /> • Comments provided by citizens at 501 entranceway, and the park drainage <br /> meetings ways. A new meadow area would be created <br /> • Comments provided through the out of an area that is now a young pine <br /> Committee's web site grove. <br /> • Comments received at two public <br /> Active Recreation <br /> forums <br /> • Information and comments gener- Most of the active recreation would be <br /> ated by committee members clustered near the northeast corner of the site <br /> • Site analysis just south of the Southern Village Park and <br /> • Information and opinions provided Ride lot.Specific facilities recommended for <br /> by the consultant inclusion in a first phase of the park include: <br /> • Staff gererated information. • Athletic/soccer fields(2) <br /> • Youth ballfield <br /> The committee recognizes that the needs of • Dog park <br /> the community are varied and sometimes in • Extension of the Fan Branch Trail <br /> conflict with one another. Citizens spoke • Large play area <br /> with passion concerning the need to both • Water play area(spray park) <br /> preserve open space and develop the prop- • Basketball courts(2) <br /> erty for active recreation.The committee • Roller hockey court <br /> also considered the need to protect estab- • Small court area(horseshoes, <br /> lished neighborhoods,protect sensitive bocce) <br /> natural areas,the lack of certain types of • Performance area <br /> active recreational facilities,and the lack of • Disc golf course <br /> large properties for future park • Picnic shelters(one large,several <br /> developement. small) <br /> • Recycling center(to be developed <br /> The proposed conceptual plan is intended to by Orange County) <br /> blend these many needs into a coherent plan • Bio-retention ponds <br /> that takes advantage of the property's topog- • Parking <br /> raphy,vegetation, and location.The plan • Restrooms (3) <br /> proposes the following general solutions to • Maintenance shed <br /> 4 <br />