Browse
Search
Agenda - 10-15-2002 - 9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 10-15-2002
>
Agenda - 10-15-2002 - 9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 10:29:36 AM
Creation date
8/29/2008 11:12:15 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20021015
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> B. Roads and Access <br /> 1. New Selou Drive, Tmmpet Court, Vine Court, Bas Balm Court, Onsli Court, <br /> Climbing Aster Court, and the new portion of High Ridge Drive shall be <br /> constructed to NCDOT standards with a 50-fact rlghtof-way and S-foot utility <br /> easoments on each side. Construction shall be inspected and approved by <br /> NCDOT. Pavement width for New Selou Ddve and High Ridge Drive shall be a <br /> minimum of 20 feet in width. <br /> OR <br /> A latter of credit or aeaow agreement or other security shall be submifted to <br /> secure construction of New Salou Drive, Trumpet Court, Vine Coup, Bee Balm <br /> Court, Onslow Court, Climbing Aster Court, and the new portion of High Ridge <br /> Drive to NCDOT standards. An estimate of the construction cast must be <br /> prepared by a celfifedllicensed engineer or grading contractor and submitted to <br /> the Orange County Planning Department and approved by the County Engineer. <br /> The financial guarantee must reffec1110 percent a that estimate and be Issued <br /> r by an accredited financial institution licensed to do business in North Carolina. <br /> The document describing development restrictions to be recorded with the Final <br /> Plat shall state fiat Me financial guarantee well not be released until the road <br /> construction has been inspected and approved by Ni <br /> 2. An emston control plan for the entire project, including all roads (New Salon <br /> Ddve, Trumpet Court,Vine Court, Bee Balm Coup, Onalow Court, Climbing Aster <br /> Court, and the new portion ct High Ridge Drive), shall be submitted by the <br /> applicant to the Orange County Emeign Control Division for review and approval <br /> prior to any disturbance on the site.. The Erosion Control Plan shall include a <br /> stormwater management plan that mi to requirements of both the County <br /> and the Noose River Basin rules. <br /> 3. Prior to any conetnlodon or any allocation of any existing access within the fight- <br /> of-way Frazier Road (SR 1342), the developer/owner shall secure a dreamy <br /> permit from the NCDOT District Office. A copy of the NCDOT-approved permit <br /> and letter to the Planning Department shall be submitted at the same time as the <br /> request for Planning Department signatures on the Final Plat. Sight distance <br /> tpanglea shall he shown at all Intersections within the subdivision, or Included <br /> whin the right-of-way of the proposed street. <br /> 4. All lots shall secure access from assets internal to the subblvlslon. Lots with <br /> frontage on more than one roatl shall bas resigned to access from the street with <br /> lower traffic volume: i.e. lot 1 and 5 to Trumpet Court, lots 6 and B to Vine Court, <br /> lots 10 and 16 to Bee Balm Court, and lots 26 and 32 to Ons aw Court. Driveway <br /> cuts shall be a minimum of 50 feet from street intersections.. These restrictions <br /> shall be stated In a document describing development restrictions and <br /> requirements to be prepared by Planning Slafi and recorded concurrently with <br /> the final plat. Non-vehicular access easement (NVA) -areas where access is <br /> prohibited to the roadway—shall also be shown on the final plat <br /> 5. Approved street name signs shall be erected at the intersections of Frazier Road <br /> (511 1342) and New Salon Drive, New Salon Drive and Trumpet Court, New <br /> Salon Drive and Vine Court, New Salon Drive and Bee Balm Court New Salou <br /> Drive and Onslow Court, New Salou Drive and High Ridge Drive, and High Ridge <br /> Drive and Climbing Aster Coup, as required In Sector IV-B-S-o12 Shown Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.