Orange County NC Website
4 <br /> GE Capita/ Modular Space Quotati©n <br /> BRANCH OFFICE: modspaee.eam <br /> RALEIGH iluot®Na.: 394090 <br /> Contact: JIMMY PASCHALL Quote Expires: 08/15/2002 <br /> Phone: 919-779-5802 Date: 09/09/2002 <br /> 1-800-523.7918 Pape No.: 2 <br /> Fax: 919.772-4856 <br /> LINE DESCRIPTION . ----- °., -- AMOUNT PERI - <br /> BOW atTerMinarion <br /> All prices EXCLUDE tax, <br /> Building permits and associated costsare not included in this quote. <br /> Local Inspector may require additional Installation not included In this lease,Any such costs.related to these <br /> requirements will be the resposibility,of the lessee <br /> On site electric and plumbing connections are provided by others. Plumbing connection provided will consist of stub <br /> out beneath fixtures. Any manifolding provided will not be the responsibility of GECMS. <br /> The step assembly price is fora 5'4'P.T.Deck with steps and handrails. <br /> The skirting price is for vinyl skirting material and labor. <br /> The footing price includes surawall application to the piers. <br /> The Ramp Assemby price is for a 5'x10'P.T.Deck with a 30'straight handicap ramp. <br /> There will be a$50.00 charge for each key not returned. Customer Is responsible for changing HVAC filter at least <br /> every 30 days and will bear costs of repairs resulting from failure to change the filter or damages to the HVAC <br /> system resulting from extraordinary environmental conditions.' <br /> Customer to provide easily accessible sits and ground conditions to support unit. All installation prices contained In <br /> this lease are based on a level soft dirt surface unless otherwise stated. Customer is responsible for any additional <br /> costs should these criteria not be met. *Downtime'required by GECMS or GECMS vendor personnel while waiting to <br /> gain entrance to site(i.e.,security gates,vehicle searches,safety training classes,waiting on decision for location <br /> of trailer, etc) will be billed at a rate of$50/menhour. Setups on a sand or other loose surface material may result is <br /> settling of trailer and additional charges to re;urn and relevel the unit. <br /> Failure to secure permits does not relieve financial responsibility of customer. <br /> Additional time incurred will be billed in the event site is not reedy for any reason GE vendors are not allowed to <br /> complete their scope of work, including but not limited to security access delays,obstructions or a delay in <br /> customer's decison on location. <br /> Customer is responsible for providing a level,dirt surface that is accessible with an industry standard road truck <br /> On site electric and plumbing connections are provided by others. Plumbing connection provided will consist of stub <br /> out beneath fixtures. Any manifolding provided will not be the responsibility of GECMS. <br /> Installation is for"Construction'or standard non-engineered foundation plan unless otherwise quoted. "Code"or <br /> installation requiring engineered foundation plans will result in additional charges. Jackstand piers may be <br /> substituted for block where practical. <br /> Ea/Ee 39tld 6VITQOW -IV.LIdtlO 39 9SOVELLete EE:Et Z667/66/60 <br />