Browse
Search
Agenda - 10-01-2002-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 10-01-2002
>
Agenda - 10-01-2002-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2017 4:35:31 PM
Creation date
8/29/2008 11:07:00 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2002
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20021001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A. SHELTER UPGRADE FOR 2002-03 <br /> First, let us thank you for the air conditioning from last;year's request. The air <br /> conditioning in the Isolation Area and Green Wing/Yellow Wing areas has made <br /> a positive impact on the health of the animals and also helps the kennel <br /> technicians get through the dog days of summer. <br /> This year we have a series of small items, but each is critical to our operations. <br /> 1. The Shelter seriously needs three wall cabinet units in'the medical room to <br /> hold the various medicines and paraphernalia used in physical exams and <br /> for treating injured and sick animals. With the level of adoptions and the <br /> numbers of animals that need blood drawn passing through this room, <br /> efficiency is compromised when the technicians cannot have their supplies <br /> well organized. With the cabinets, we.can organize supplies that are used <br /> on an hour-to-hour basis so the health care technicians can handle the <br /> animals more effectively. Each unit is$500, total$1,500. <br /> TOTAL- $1,500 <br /> 2. ' Flooring for the front office area, bathrooms and medical room.. The floor <br /> is very old and cracking, and for both appearance and for maintaining <br /> bacteria-free areas, this replacement will make a big difference and it will <br /> last through the five years we have left here. The total cost installed, for <br /> seamless vinyl flooring: <br /> TOTAL: $3,893 <br /> 3. We need to replace GUIL07INE DOORS that were damaged during the <br /> pit bull era. Not only is it not healthful for the animals (because of drafts) <br /> during the winter months, but we are heating the out-of-doors through the <br /> holes at the bottom of these doors that are in disrepair. We need: <br /> 18"x30" <br /> 10 needed at$75 each <br /> TOTAL: $750 <br /> 4. Rabies vaccine to vaccinate approximately 1,500 more animals against <br /> rabies while sheltered: <br /> TOTAL: $1,367. <br /> 1. wall cabinets... 1,500 <br /> 2. flooring.......... 3,893 <br /> 3. guillotine doors...... 750 <br /> 4. rabies vaccine....... 1,367Ih bui <br /> Total: $7,510 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.