Browse
Search
Agenda - 09-17-2002 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-17-2002
>
Agenda - 09-17-2002 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2017 11:03:28 AM
Creation date
8/29/2008 11:03:46 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20020917
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> recommend showing better connections to Scroggs School, the southern park and ride lot, and to <br /> extend the paved trail to the southern tip of the park. <br /> Staff Comments: We believe that the conceptual plan currently does a good job of planning for <br /> bicycle and pedestrian access to most of the internal site. The plan also provides direct access from <br /> Southern Village by way of an extended Fan Branch Greenway Trail. However, we agree with the <br /> Committee that several changes to the plan would result in a better overall pedestrian and bicycle <br /> transportation program. These include: <br /> • Extend the paved Fan Branch Trail to the southern tip of the park site. <br /> • Provide improved pedestrian access (paved trail or sidewalk) on the north side of Dogwood <br /> Acres Drive from the western park boundary to the point where the paved Fan Branch Trail <br /> crosses Dogwood Acres Drive. <br /> • Show additional pedestrian connections to the southern park and ride lot and Scruggs <br /> School. <br /> 4. Use of the Southern Park and Ride Lot: The Transportation Board recommended that the plan <br /> should clarify the relationship of the possible use of existing park ride parking for recreational <br /> uses during evening and weekend periods and the possible use of the Southern Community Park <br /> parking for park ride uses during weekends. <br /> Staff Comments: Please refer to pages 6, 13, and 20 of the Report. The park and ride lot was built <br /> with federal funds primarily to serve the bus system. However, we believe that the counter cyclical <br /> nature of the parking needs for the park and commuters would strengthen the parking reserves of <br /> both facilities. Park users would be expected to spill over onto the park and ride lot on weekends <br /> and evenings. Commuters could use the park parking lot weekdays. We believe that the potential <br /> for conflict would occur primarily on the Saturdays of the six home football games and other <br /> weekend afternoons when the park and ride lot may be used by Tar Heel Express to transport people <br /> to UNC basketball games and other special events. <br /> 5. Scroggs School Parking Lot: The Transportation Board recommended that the plan clarify the <br /> possible use of Scroggs School parking for recreational purposes. <br /> Staff Comments: The Town and the Chapel Hill/Carrboro City Schools currently have an agreement <br /> that guarantees public use of the school parking lot, when not in use by the schools, until the year <br /> 2027. However, we do not believe that use of the school parking lot would be necessary for normal <br /> park operations. <br /> 6. Buffer along Highway 15-501: Members of the Community Design Commission and the <br /> Planning Board expressed a concern related to protection of the southern entranceway into Town <br /> and the width of the buffer along Highway 15-501. <br /> Southern Community Park Conceptual Plan Committee Comments: The Committee voted to <br /> recommend that the 50 foot minimum buffer currently shown along Highway 15-501 be maintained <br /> and that it be supplemented with additional vegetation if needed. <br /> Staff Comments: We agree with the Committee that the 50 foot buffer currently shown on the <br /> conceptual plan be maintained and supplemented where needed. <br /> 7. Proximity of Parking to the Athletic Fields and Picnic Areas: A member of the Community <br /> Design Commission suggested that the athletic fields and picnic areas are located too far from <br />
The URL can be used to link to this page
Your browser does not support the video tag.