Browse
Search
Agenda - 09-17-2002 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-17-2002
>
Agenda - 09-17-2002 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2017 10:56:50 AM
Creation date
8/29/2008 11:03:15 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 20020917
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> will receive funding for the current and future fiscal years. Fdr these and other reasons, the task force has <br /> delayed finalizing the programming for the building. In the meantime as shown on the table below, <br /> approximately$390,000 will be spent for improvements at the NHSC over the next year. <br /> The Board will also note in the table below that $51,000 is reserved for contingencies in both the REWHSC <br /> renovations and those at the NHSC. Since both of the facilities were built during an era in which building <br /> practices were significantly different than those used today, the possibility of additional expense to mitigate <br /> hidden conditions is significant. By way of comparison, the contingency amount conservatively represents <br /> approximately 2.4% of the REWHSC HVAC renovation contract. <br /> Recommendations for allocation of funds between the REWHSC and NHSC are listed below. With the <br /> exception of the restroom improvements mentioned earlier, the needs at REWHSC will be met by this <br /> allocation, while some of the more critical needs will be met at the NHSC. Funding for other facility needs <br /> at the NHSC will be addressed in future CIPs. <br /> Whitted Human Services Amount Funding Sou s <br /> HVAC Replacement(approved by <br /> BOCC June 2002) $2,064, 2/3 Net Debt Reduction Bonds <br /> Data Wiring(approved by BOCC <br /> June 2002 $50, 2/3 Net Debt Reduction Bonds <br /> Tile Replacement in Central Rea $80,000 2/3 Net Debt Reduction Bonds <br /> Painting and Floor Covering in offices <br /> and corridors of facility $500,000 2/3 Net Debt Reduction Bonds <br /> Total 1Nhitted Human Services $2, 4,000 <br /> Northern Human Services Amount Funding Sou s <br /> Water Supply $40,000 2001 Recreation, Park and Open Space Bonds <br /> Waste Water Treatment§yslem $250,000 Previously Approved A You-Go Funds <br /> Additional Land Purchase as May Be <br /> Required for Waste Water System <br /> Installation Unknown 2001 Recreation, Park and Open Spam Bonds <br /> General Renovations(including <br /> upgrades to the mstroorr�s $100,000 213 Net Debt Reduction Bonds <br /> Total Northern Human Services $390,000 <br /> Contingency for both projects $51,000 213 Net Debt Reduction Bonds <br /> Note: Additional Land for Park <br /> ffNpanslon,(purchased in 1998 $110,00011997 Recreation and Park Bands <br /> FINANCIAL IMPACT: Included in the background information above, <br /> RECOMMENDATION (S): The Manager recommends that the Board: <br /> 1. Allocate $580,000 in 2/3 Net Debt Reduction Bonds for renovations at the REWHSC Building as <br /> outlined; <br /> 2. Allocate $100,000 in 213 Net Debt Reduction Bonds for renovations at the NHSC as outlined; <br /> 3. Allocate $51,000 in 213 Net Debt Reduction Bonds for contingency funds to be used at either facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.