Browse
Search
Agenda - 09-17-2002 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-17-2002
>
Agenda - 09-17-2002 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2017 10:55:50 AM
Creation date
8/29/2008 11:02:56 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
Minutes - 20020917
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
NA ORD-2002-027 Hillsborough Elementary School Renovation Capital Project Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Hillsborough Elementary School Renovations 7/25/2002 <br /> Preliminary Deport on Existing Facilities page 44 <br /> i <br /> Ceramic mosaic tile is used in the group toilet rooms with a 72"high glazed ceramic tile <br /> wainscot. <br /> • An inadequate HVAC system The HVAC system consists of a two-pipe, <br /> heating system that emanates from the boiler room located below the cafeteria. Insulated and <br /> jacketed steam heating pipes,that replaced ruptured,underground steam pipes in 1997,travel <br /> across the existing covered walkways and enter the building on the south end of the building, <br /> Air conditioning is provided by individual window air conditioning units. The cooling tower <br /> (mentioned above)appears to be sized to provide air conditioning to the 300 Building in the <br /> future. <br /> The Cafeteria Building opened in 1952. The Cafeteria Building exhibits the following features: <br /> • A one-story, lightweight,structural steel frame with a concrete slab floor and a"Cemesto <br /> Insulation Roof Deck". <br /> • An exterior wall consisting of 12"thick masonry walls and aluminum windows. The walls <br /> are made up of an 8"concrete masonry unit and a 4"exterior brick. The original windows <br /> were replaced in about 1990 with a thermally unbroken aluminum window system. <br /> • A roof that has reached its useful life and needs to be replaced. The single-ply membrane <br /> roof was replaced in 1987(15 years old). Many small blemishes are forming due to its age <br /> that could create small leaks in the future. The original roof deck was truly flat with internal <br /> drainage. Tapered insulation and large,galvanized steel gutters were added during the <br /> reroofing to provide minimal slope and to collect the rainwater and divert it to the grade. <br /> According to The Garland Co.,a roofing consultant that assessed the condition of the roof <br /> earlier this year,the existing single-ply roofing membrane and the roof insulation needs m be <br /> replaced and the periineter flashing needs major repairs. <br /> • Floors that are mostly vinyl composition file(some placed over vinyl asbestos tile) in the <br /> dining area,and quarry the in the kitchen. <br /> • A heating system consisting of unit heaters located near the ceiling and an cooling system <br /> consisting of(2)floor-mounted package air conditioning units. <br /> The Gymnasium Building opened in 1959. The Gymnasium Building exhibits the following <br /> features: <br /> • Two separate structural systems. The gymnasium area is a steel,long-span structural system <br /> with steel trusses and purlins. The locker area is a one-story,poured-in-place concrete <br /> structure. <br /> • An exterior wall consisting of 12"to 16"thick masonry walls with original metal windows. <br /> • A roof that is serviceable. It appears the curved gymnasium roof is a modified bitumen roof <br /> with a granular cap sheet(similar to 300 Building), and according id'school system records, it <br /> was replaced in 1988(14 years old). The flat,locker area roof appears to be a four-ply built- <br /> up roof,and according to school system records,was replaced in 2001..During site <br /> investigation, ponding water was noted on the locker area roof. <br /> • Finishes are all original. The wood flooring in the gymnasium and stage area is maple <br /> flooring and has been renovated recently. The lobby,toilet rooms,offices and locker areas <br /> are all in original condition. <br /> • A building program that includes physical education, art,and miscellaneous <br /> (919) 1.)42-8586 Telephone R051602existingfacilities.doc <br /> (919)929-4802 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.