Browse
Search
Agenda - 09-17-2002 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-17-2002
>
Agenda - 09-17-2002 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2017 10:55:50 AM
Creation date
8/29/2008 11:02:56 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
Minutes - 20020917
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
NA ORD-2002-027 Hillsborough Elementary School Renovation Capital Project Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Hillsborough Elementary School Renovations 7/25/2002 <br /> Preliminary Repont on Existing Facilities Page 7 <br /> l <br /> These units should be investigated so their intrusion into the classroom(both from a space and <br /> noise aspect)could be minimized. <br /> • Reroofing of this building does not appear to be needed. The introduction of gutters and <br /> downspouts and the reworking of surface drainage patterns could help control the flow of <br /> water and the mitigation of damage by water on the building. <br /> • Provide new standardized casework in all classrooms with an emphasis on storage of <br /> classroom materials. <br /> • Determine whether new lighting fixtures are watranfe& Verify the Condition of acoustical <br /> ceilings and replace as necessary. <br /> • Provide new doors and door hardware into each room. Try to reuse the existing door frames. <br /> • Repaint the entire building on the interior. <br /> • Determine if any electrical upgrades are requited or desired by the school. Provide,if <br /> necessary,a data closet and/or electrical closet for electrical upgrades. <br /> Cafeteria Building <br /> • Remof the building including new insulation and edge flashing. <br /> Gymnasium Building <br /> • Depending on the final programmatic requirements agreed to, some or all of the rooms will <br /> need to be renovated in some fashion. <br /> t <br /> (919)942-8536 Telephone R051502existingfacilities.doc <br /> (919)929-4802 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.