Orange County NC Website
11 <br /> Hillsborough Elementary School Renovations 7/25/2002 <br /> Preliminary Repont on Existing Facilities Page 7 <br /> l <br /> These units should be investigated so their intrusion into the classroom(both from a space and <br /> noise aspect)could be minimized. <br /> • Reroofing of this building does not appear to be needed. The introduction of gutters and <br /> downspouts and the reworking of surface drainage patterns could help control the flow of <br /> water and the mitigation of damage by water on the building. <br /> • Provide new standardized casework in all classrooms with an emphasis on storage of <br /> classroom materials. <br /> • Determine whether new lighting fixtures are watranfe& Verify the Condition of acoustical <br /> ceilings and replace as necessary. <br /> • Provide new doors and door hardware into each room. Try to reuse the existing door frames. <br /> • Repaint the entire building on the interior. <br /> • Determine if any electrical upgrades are requited or desired by the school. Provide,if <br /> necessary,a data closet and/or electrical closet for electrical upgrades. <br /> Cafeteria Building <br /> • Remof the building including new insulation and edge flashing. <br /> Gymnasium Building <br /> • Depending on the final programmatic requirements agreed to, some or all of the rooms will <br /> need to be renovated in some fashion. <br /> t <br /> (919)942-8536 Telephone R051502existingfacilities.doc <br /> (919)929-4802 Fax <br />