Browse
Search
Minutes - 19670206
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 8:46:32 AM
Creation date
8/13/2008 12:03:41 PM
Metadata
Fields
Template:
BOCC
Date
2/6/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 11 - <br />8.9.1 Plans for the continual transformation of ex- <br />'tractive areas to gently rolling surface top - <br />ography as.each portion of the extractive <br />site is "mined out' and operations are moved <br />to•neW portions of the extractive site. Slopes <br />in such areas of discontinued operations shall <br />not exceed 15$. in grade except in areas where <br />rock or other conditions would cause the cre- <br />ation of such slopes to be an extreme burden <br />and hardship. in no rase shall any surface <br />slope have a grade in excess of 509 when <br />extractive or processing operations have been <br />terminated. <br />9. 9.2 All buildings, structures, equipment and stock - <br />piles.shal.l be removed from areas of dis- <br />continued extractive operations. <br />8.9.3 All areas of discontinued extractive operations <br />shall be covered with soil of a type which will <br />support the growth of vegetation, and shall be <br />planted with grasses, legumes, trees, or other <br />planting in such a way as to minimize wind <br />and water erosion in such areas where the <br />Planning Board shall determine•such covering <br />to be practical. <br />8.9.4 All extractive uses existing on the effective <br />date of this ordinance, whether actually in <br />operation on said date or not, shall within <br />.90 days of said effective date.or 90 days of <br />resuming operations, whichever is greater, <br />present a rehabilitation plan to the Planning <br />Board for its consideration. <br />8.9.5 Said rehabilitation plan shall include estimates. <br />of any and all costs necessary to carry it out. <br />Said cost estimates including those covering <br />modifications which•the Planning Board may <br />request shall be certified by a civil engineer <br />licensed to practice in the state of North <br />Carolina, the Orange Soil and Water Conservation <br />District or its designated representative, or <br />other authority accepcable to the Planning <br />Board. <br />8.9.6 A performance bond in the amount of said <br />estimated costs shall be posted with the <br />County Administrator to insure the making of <br />improvements called for in said rehabilitation <br />plan. Portions of said bond may be released <br />by the Planning Board- upon satisfactory evidence <br />by the Zoning Officer that portions of the plan <br />have been completed. All portions of said bond <br />
The URL can be used to link to this page
Your browser does not support the video tag.