Browse
Search
Agenda - 09-09-2002 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-09-2002
>
Agenda - 09-09-2002 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:35:33 PM
Creation date
8/29/2008 11:00:03 AM
Metadata
Fields
Template:
BOCC
Date
9/9/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20020909
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aa <br /> 2. Create Project Plan Group to review report and make recommendations on <br /> key decisions and projects to be funded — report sent to each elected board <br /> 3. Upon receipt of Town actions on Project Plan Group recommendations, <br /> consider and adopt greenways project plan. <br /> 4. Review plans at upcoming Assembly of Governments (spring 2003?) <br /> Little River Regional Park (Grant-funded) <br /> 1. Durham and Orange County representatives review draft concept plan <br /> (consultant) <br /> 2. Little River Park Advisory Committee reviews draft concept plan, and <br /> recommends for adoption to the Boards of Commissioners in Durham and <br /> Orange Counties <br /> 3. Boards review and approve concept plan <br /> 4. Interlocal agreement reviewed and agree to regarding operation and <br /> maintenance of park <br /> 5. Bids solicited for construction of park, approved by Board of Commissioners <br /> 6. Volunteers and non-profits work to develop and finalize trails at park <br /> 7. Park construction begins 2003, and opens to public in Fall 2003. <br /> McGowan Creek Preserve (1997 parks bond) <br /> 1. Topographic survey and site plan prepared <br /> 2. DOT requested to address turn lane <br /> 3. Board considers site plan for facility (October 2002) <br /> 4. Construction Spring 2003 (with volunteers doing trail construction) - <br /> McGowan Creek Preserve opens for use FaIINVinter 2003 <br /> Mapleview Soccer Field (1997 Parks Bond/Other <br /> 1. Survey and lease completed <br /> 2. Field design site plan developed by Open Space Design Specialist <br /> 3. Owners review and approve site plan <br /> 4. Board approves site plan (October 2002) <br /> 5. Bids for field construction, and construction of field (FaIlMinter 2002) <br /> 6. Field available for play Spring 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.