Browse
Search
Agenda - 09-09-2002 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-09-2002
>
Agenda - 09-09-2002 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:35:33 PM
Creation date
8/29/2008 11:00:03 AM
Metadata
Fields
Template:
BOCC
Date
9/9/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20020909
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a� <br /> * —after outstanding issues resolved by BOCC/Town work g roup <br /> Stage 2 — Bids and Construction <br /> Develop construction drawings and bids, gain Town site plan approval, <br /> award bid to contractor(s)and construct the park facilities according to the <br /> BOCC-adopted plan. <br /> Resource s <br /> Estimated Cost $830,000 <br /> Construction Project Commissioner <br /> Team Commissioner <br /> County Manager (or designee) <br /> Recreation and Parks Management Director <br /> €." Purchasing Director <br /> Open Space Design Specialist <br /> County Engineer <br /> aq' ERC Director <br /> �I 6tf �GnM�. <br /> Planning Director <br /> y Park Services Director <br /> Town staff if Joint Master Plan process) <br /> Projected Construction Begins: February, 2004 <br /> Projected ed`Park Opening Date:I Spring, 2005 <br /> Axle a Zees to paoeeed st d4 t MC, <br /> If the Board is ready to proceed with planning for this park: <br /> 1. Create a BOCC workgroup to meet with like contingent from <br /> Hillsborough to discuss joint park and. Master Plan opportunities, and <br /> scope of project <br /> 2. Once key decisions made, develop and adopt pre-concept plan <br /> 3. Appoint Fairview Park Concept Plan (or Fairview Campus Master Plan) <br /> Committee, with charge and mission (scope of work), based on pre- <br /> concept plan and any operating principles the Board wishes to apply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.