Orange County NC Website
a� <br /> * —after outstanding issues resolved by BOCC/Town work g roup <br /> Stage 2 — Bids and Construction <br /> Develop construction drawings and bids, gain Town site plan approval, <br /> award bid to contractor(s)and construct the park facilities according to the <br /> BOCC-adopted plan. <br /> Resource s <br /> Estimated Cost $830,000 <br /> Construction Project Commissioner <br /> Team Commissioner <br /> County Manager (or designee) <br /> Recreation and Parks Management Director <br /> €." Purchasing Director <br /> Open Space Design Specialist <br /> County Engineer <br /> aq' ERC Director <br /> �I 6tf �GnM�. <br /> Planning Director <br /> y Park Services Director <br /> Town staff if Joint Master Plan process) <br /> Projected Construction Begins: February, 2004 <br /> Projected ed`Park Opening Date:I Spring, 2005 <br /> Axle a Zees to paoeeed st d4 t MC, <br /> If the Board is ready to proceed with planning for this park: <br /> 1. Create a BOCC workgroup to meet with like contingent from <br /> Hillsborough to discuss joint park and. Master Plan opportunities, and <br /> scope of project <br /> 2. Once key decisions made, develop and adopt pre-concept plan <br /> 3. Appoint Fairview Park Concept Plan (or Fairview Campus Master Plan) <br /> Committee, with charge and mission (scope of work), based on pre- <br /> concept plan and any operating principles the Board wishes to apply. <br />