Browse
Search
Agenda - 09-09-2002 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 09-09-2002
>
Agenda - 09-09-2002 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:35:33 PM
Creation date
8/29/2008 11:00:03 AM
Metadata
Fields
Template:
BOCC
Date
9/9/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20020909
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i8 <br /> Stage 2 — Bids and Construction <br /> Develop construction drawings and bids, gain site plan approval, award bid <br /> to contractor(s) and construct the park facilities according to the BOCC- <br /> adopted plan. <br /> Activity Resources <br /> Estimated Cost $248,000 <br /> Construction Project Commissioner <br /> Team Commissioner <br /> 4 ; County Manager(or designee) <br /> Recreation and Parks Management Director <br /> Purchasing Director <br /> Open Space Design Specialist <br /> County Engineer' <br /> ERC Director <br /> Planning Director <br /> Park Services Director <br /> Plan Review Work Grou p kept <br /> apprised of activity. <br /> "Best-Case" Construction Begins: June, 2003 <br /> Projected Park Opening.Date: Summer/Fall,2004*' <br /> * - Depends on what facilities are to be built <br /> vArtoa zeeded ro Paoc at rAla ?tare. <br /> If the Board is ready to proceed with planning for this park: <br /> 1. Create Efiand-Cheeks Park Work Group to review the existing concept <br /> plan for the park for adequacy and changed conditions, and amend as <br /> needed. Review letter from existing community group about <br /> involvement. <br /> 2. Adopt operating principles and charge for Work Group, as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.