Orange County NC Website
FROM MRRY E MYERS FRX NO. : 919 942 7070 Rug. 23 2902 05:00PM P1 <br /> t <br /> 2 <br /> MARY E. AYERS, PLS <br /> 8111 NC OLD 86,CHAPEL HILL,NC 27516 <br /> (PH)919 942~7906 TX)919.942.707© <br /> Rich Shaw <br /> Oraago Co.Dept of E&RC <br /> VIA FAX 644-3351 <br /> RE:Estimate for Topographic Survey.Chapel Hill Twp.Park&School Site <br /> Dear Rich: <br /> I am pleased to present this estimate for the topo&tree location for the 193 acre site <br /> Which I surveyed in 2001.As we discussed,this is a very large area for a conventional <br /> Topo with one foot intervals and a fairly small minimum tree size.Additionally,the <br /> Timbering about 3 years ago has made the forested areas extremely done with <br /> Piles of scrap timber.undergrowth,and sprouting stomps from the harvested timber. <br /> These factors obviously make the field work more difficult and expensive,especially <br /> If the survey needs to be done prior to early November,when the leaves begin to <br /> Fall.Therefore I am giving you two prices per acre,depending on when the work would <br /> Be scheduled. <br /> My rates per hour are still$70.00 for field&$65.00 per my time in the office. <br /> Typically I find that a wooded acre takes about 2.5 field hours($175.00)and 1.0 office <br /> Hours($240.00)which I round up m$250.00 when I estimate.For an open area,I <br /> Use a figure of$150.00 per acre.i have used a ball park of 30 acres for the open area. <br /> Therefore,a purely acreage basis: 163 acres x$250.00 per acre=$40750.00 <br /> 30 acres x$150.00 per acre=$4500.00 <br /> TOTAL ESTIMATED"LEAF-ONCOST $45250.00 <br /> IF I CAN WAIT UNTIL AFTER OCTOBER TO BEGIN THE WOODED AREA, <br /> I WILL CUT MY COST FOR THE WOODED AREAS BY 20%: <br /> 163 acres x$200.00 per acre=332600.00 <br /> 30 acres x$150.00 per acts= $4$DO.Ob <br /> TOTAL ESTIMATED"LEAF—OFF COST: $37100.00 <br /> As we discussed,if this proposal is acceptable,I would like to work closely with your <br /> Staff to begin work on the key arena first,and do the project in stages based on the <br /> The areas targeted for building sites,eta <br />