Browse
Search
Agenda - 08-20-2002 - 8t
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8t
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:42:02 PM
Creation date
8/29/2008 10:53:42 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8t
Document Relationships
2002 S Register of Deeds - Software with American Cadastre, LLC (AmCad)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2002
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 7. TRAINING <br /> The Contractor agrees to provide informal, "hands-ori" instruction to mutually agreed <br /> upon by County personnel in the operation of the equipment, as a standard part of the <br /> installation of the system, at mutually agreeable times prior to,or subsequent to, system <br /> installation, for purposes of familiarization with all system operation. The County shall <br /> ensure that all designated personnel are made available for such training to be completed <br /> by the Contractor in accordance with the plan which shall be presented as part of the <br /> Functional Specification. Any additional training provided by the Contractor shall be at <br /> the additional expense of the County. <br /> 8. DOCUMENTATION <br /> The Contractor agrees to provide to the County, as per Exhibit A, a reasonable number of <br /> all non-proprietary manuals and other printed materials, and up-dated versions thereof, <br /> which are necessary or useful to the County in its use of the system to be supplied <br /> hereunder. <br /> 9. WARRANTY <br /> The Warranty period is 180 days after Acceptance of the system or 30 days of continuous <br /> use of the system by the Register of Deeds Office.Thus the acceptance and warranty is as <br /> follows: <br /> System deemed accepted after 30 days of successful use of the system. <br /> System warranty starts after system acceptance and warranty starts 180 days after <br /> system acceptance and the system is warranted for 180 days.After which time the <br /> maintenance period begins and payment for the first year maintenance is due. <br /> Notwithstanding the manufacturer's system warranties as applicable,the Contractor shall <br /> warrant that all system supplied hereunder shall function in accordance with its published <br /> specifications for 180 days from date the County accepts the equipment. During such <br /> warranty period, all software repairs or deficiencies noted by the County shall be reported <br /> to the Contractor and resolved without any charge whatsoever to the County and within a <br /> reasonable period of time. This warranty provision shall not apply to software repairs or <br /> deficiencies caused by improper operation, deliberate acts by County employees or their <br /> agents,or damages caused by acts of God. In such cases, Contractor shall be entitled for <br /> reasonable expenses incurred in making system repairs. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.