Browse
Search
Agenda - 09-30-2003-a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-30-2003
>
Agenda - 09-30-2003-a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 3:24:17 AM
Creation date
8/29/2008 10:51:46 AM
Metadata
Fields
Template:
BOCC
Date
9/30/2003
Document Type
Agenda
Agenda Item
a
Document Relationships
Minutes - 20030930
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />provide an additional $2.2 million for the project if CHCCS provided the BOCC with a <br />satisfactory proposal `for a design of CHCCS high school #3 that promotes smart-growth, which <br />design addresses `reduced parking, ~reducedJ land disturbance, and other deleterious aspects <br />of current plans' <br />An ad hoc group (comprised of County/Schools/Town/DOT elected officials and staff, smart <br />growth experts, and interested citizens) has met on several occasions during the past month to <br />discuss specific smart growth design criteria that could be applicable to new school construction <br />in general, and specifically, the CHCCS third high school project. County Commissioners and <br />staff involved in this effort will provide a brief update on progress to date. <br />No Attachments <br />3. Air Quality Update <br />As anticipated at the April 2003 Assembly of Governments meeting, issues and activities <br />related to air quality have progressed on two fronts. <br />First, the State has now formally recommended to the U.S. Environmental Protection Agency <br />that the Triangle region (among others) be designated as an "ozone non-attainment area." The <br />official designation would be made by EPA in April 2004. <br />Implications of this designation include more restrictive requirements for new large industrial <br />sources, requirements that transportation plans demonstrate no worsening of air quality, and a <br />potential withholding of Federal transportation funds for new road projects. The degree of local <br />measures that will be needed or requested to address non-attainment is not yet known, as the <br />State Air Quality Division continues to assess possible Statewide and region-wide measures <br />toward a State Implementation Plan (SIP). <br />Secondly, prior to this ozone recommendation, Orange County, Chapel Hill and Carrboro had <br />joined the International Council for Local Environmental Initiatives (ICLEI) and the <br />Cities/Counties for Climate Protection (CCP) program. As noted in the April 2003 Assembly of <br />Governments agenda item, each local government in this program agrees to conduct a <br />Greenhouse Gas (GHG) emissions inventory and action plan. At that time, the County and <br />Town boards indicated a positive response to the concept of joining forces on this project for <br />comprehensiveness and efficiency. <br />In June, the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (MPO) approved <br />funding for portions of this project, and staff has developed a Request for Qualifications (RFQ) <br />and proposed Scope of Work (attached). This was submitted to several known consultants in <br />August, but the request yielded only one submittal. Staff proposes to re-submit another RFQ to <br />gauge additional interest, and report back later this fall. The schedule in the RFQ will also need <br />to be adjusted to reflect this timetable. <br />The amount of grant funding for the project from the MPO may be more limited than initially <br />thought, as the federal funding sources which allocate these monies will fund only project <br />objectives that have a direct transportation function. As such, it is possible that a higher <br />percentage of the cost of this initiative (projected to be $30-45,000 total) would have to come <br />from local matching dollars. A draft Memorandum of Agreement is being prepared by staff to <br />address the roles and responsibilities (financial and otherwise), for elected boards review later <br />
The URL can be used to link to this page
Your browser does not support the video tag.