Orange County NC Website
5 <br /> Addie Bradshaw <br /> 6803 High Rock Rd. <br /> Mebane <br /> 563-3895 <br /> April 11, 2002 <br /> EXTERIOR: <br /> 1. Prepare the soffitt, fascia, trim, windows, doors, awnings and porch ceiling for <br /> paint.Paint those surfaces with at least two coats of exterior semigloss latex paint. <br /> Remove all rust from the wrought iron front porch columns.Prime and paint. <br /> Paint to cover all surfaces completely, <br /> 2. Install wrought iron handrails on the rear porch and steps. <br /> 3. Install one replacement foundation vent. <br /> 4. Install soffitt vents every eight feet in the front and rear soffitt. <br /> 5. Install four storm windows on the living room windows. <br /> ROOF: <br /> 1. Remove the porch and front section of the living room roof covering to the <br /> sheathing. Install 15.1b. felt, aluminum drip edge and three tab fiberglass shingles. <br /> Step flash the shingles against the siding. <br /> 2. Replace approx. 64 sq. ft. of sheathing. <br /> 3. Install a shingle type ridge vent ventilation system. <br /> 4. Remove the turbine vent. Repair the plywood. Install matching shingles. <br /> 5. Remove the shingles to the sheathing on the left side porch. Install 15 lb. felt, <br /> aluminum drip edge and three tab fiberglass shingles. Step flash the shingles to <br /> the siding and brick. <br />