Browse
Search
Agenda - 08-20-2002 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:20:54 PM
Creation date
8/29/2008 10:50:59 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> Dorothy Riley page 2 <br /> 222 Collins Ave. <br /> Hillsborough,NC 27278 <br /> 5/01/02 <br /> EXTERIOR CONTINUED: <br /> 13. Install vinyl solid soffit on the back porch ceiling. <br /> 14. Cover all facias, eves and overhangs with white coil stock. <br /> Repair all rotten wood before installation of coil stock. <br /> 15. Remove the tin that is covering the damaged asbestos siding at the base <br /> of the foundation. <br /> 16. Remove the exterior window frame on the right/rear comer. Install <br /> composite siding to match the existing siding. <br /> 17. Repair all broken,cracked, and missing asbestos siding. Install composite <br /> siding to match the existing asbestos siding. Pressure wash the exterior and <br /> paint. Paint the siding with at least 2 coats of flat latex paint. Paint to cover <br /> completely. Caulk all voids and cracks before painting. <br /> 18. Install D-5 vinyl siding on the dormer windows and wrap the facias, eves, <br /> overhangs and window frames with white coil stock. <br /> 19. Remove the window in the laundry room. Frame up the opening with 2x4 <br /> lumber. Install %inch plywood over the studs and cover with vinyl siding. <br /> Insulate with R-15 insulation and install matching paneling on the inside. <br /> 20. Remove the roof covering from the back section of the house. Repair the bottom <br /> section of 1x6 wood. Cover V2" CD plywood,black felt and matching 20 year shingles. <br /> Install 5V Corrugated metal on the low pitch. Install ridge cap on the hips. <br /> 21. Install a shingle type ridge ventilation system. <br /> 22. Install continuous aluminum gutters and downspouts. Install plastic <br /> splashblocks under each downspout. <br /> 23. Prepare the front door frame for paint. Remove all loose paint and prime <br /> with an oil primer. Paint the door frame with two (2)coats of white <br /> semigloss paint. Paint shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.