Browse
Search
Agenda - 08-20-2002 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:20:54 PM
Creation date
8/29/2008 10:50:59 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> Mary Haith page 6 <br /> 8809 Harmony Church Rd. <br /> Mebane,NC 27302 <br /> 4/2/02 <br /> BATHROOM: <br /> 1. Remove the tub and commode. Remove the wall and ceiling sheetrock <br /> to the studs-and ceiling joists. <br /> 2. Repair the damaged subfloor and floor joists. Install new 2 x 8 treated <br /> floor joists. Repair the damaged sill plates with treated lumber. <br /> 3. Frame up the bathroom window with 2 x 4 studs. Cover the outside with <br /> %z"plywood and wrap with white coil stock. <br /> 4. Reframe the door opening for a 32"door. Install new casing and jamb. <br /> Install a new 32"interior door. The door shall swing opposite the <br /> sink and commode. Install a privacy lockset. Prime and paint the door <br /> and trim with semigloss latex paint. Paint to cover completely. <br /> Install new sheetrock on kitchen side where necessary. Finish the sheetrock <br /> smooth. <br /> 5. Install Y2" MR sheetrock on the walls and ceiling. Finish the sheetrock <br /> smooth. <br /> 6. Prime and paint the walls and ceiling with semigloss latex paint. <br /> Paint all trim with semigloss latex paint. Paint to cover completely. <br /> 7. Install new 3 '/<inch baseboard and shoe molding. Prime and paint <br /> with semigloss latex paint.Paint to cover completely. <br /> Install a baseboard style door bumper. <br /> 8. Prepare the floor for vinyl. Install ''/<inch lauan plywood over the <br /> subfloor. Install a new vinyl floor. Vinyl to cost not less than $ 14/yd. <br /> Install metal trim at the door opening. <br />
The URL can be used to link to this page
Your browser does not support the video tag.