Browse
Search
Agenda - 08-20-2002 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:20:54 PM
Creation date
8/29/2008 10:50:59 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> Mary Haith page 4 <br /> 8809 Harmony Church Rd. <br /> Mebane,NC 27302 <br /> 4/2/02 <br /> BEDROOM# 1: <br /> 4. Install new door and window casing to match. Install ''/a"colonial <br /> baseboard. Install new window stools and aprons on the windows. <br /> 5. Prime the walls and ceiling with new sheetrock primer. Paint the walls and <br /> ceiling with flat interior latex paint.Paint the interior of the closet. <br /> Paint to cover completely. <br /> 6. Prime all new woodwork with interior latex primer. Prime the existing trim <br /> and doors with oil based primer. Paint all trim with semigloss latex paint. <br /> Prime and paint the exterior of the closet. Paint to cover completely. <br /> Caulk all cracks in trim and molding before painting. <br /> BEDROOM#2: <br /> 1. Repair the buckled ceiling tiles. <br /> 2. Paint the walls and ceiling with flat latex paint. Paint to cover completely. <br /> Paint the trim and doors with semigloss latex paint. <br /> 3 Frame a 26"x 60"closet. Cover the walls with Y2" sheetrock and <br /> finish smooth. Install 3 ''/a"baseboard on the inside and outside of closet. <br /> Install a shelf and rod. Install a 4' bifold door unit. Prime and <br /> paint the walls with flat latex paint. Prime and paint the trim and doors with <br /> semigloss latex paint.Paint to cover.completely. <br /> 4. Install new 1 %z'doorstop on the bedroom door. Prime and paint and with <br /> semigloss latex paint.Paint to cover completely. <br /> KITCHEN PLUMBING: <br /> 1. Tie the kitchen sink and washing machine drain into the main line leading <br /> to the septic tank. Install a mechanical vent under the sink area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.