Browse
Search
Agenda - 08-20-2002 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:20:54 PM
Creation date
8/29/2008 10:50:59 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> Mary Haith page 3 <br /> 8809 Harmony Church Rd. <br /> Mebane,N.C. 27302 <br /> 4/2/02 <br /> LIVING ROOM: <br /> 3. Install %2"sheetrock on the walls and ceiling after the electrician has <br /> rewired the living room. Finish the sheetrock smooth. <br /> 4. Extend the door and window jambs to allow for the %2"sheetrock. <br /> 5. Install new door and window casings. Install new window stool and <br /> apron on both windows. <br /> 6. Install new baseboard in the living room. Install 3 ''/a"colonial baseboard. <br /> 7. Install new 3 inch crown molding in the living room. <br /> S. Prime the sheetrock with new shectrock latex primer. Paint the walls and <br /> and ceiling with flat latex paint,Paint to cover completely. <br /> 9. Prime all new and existing woodwork. Paint the casing,jambs, <br /> crown molding, doors and baseboard with semigloss latex paint. <br /> Caulk all cracks in the trim and molding before painting. <br /> 10. Weatherstrip the door leading to the upstairs. Weatherstrip the jamb <br /> and install a threshold. The bottom of door must be airtight. <br /> 11. Install a new handrail leading up the stairs. <br /> BEDROOM#1: <br /> 1. Remove the window stool and all door and window casing to facilitate <br /> the installation of sheetrock. <br /> 2. Install %2" sheetrock on the walls and ceiling after the electrician has rewired <br /> the bedroom. Finish the sheetrock smooth. <br /> 3. Install jamb extensions on the door and windows frames to allow for the <br /> sheetrock. <br />
The URL can be used to link to this page
Your browser does not support the video tag.