Browse
Search
Agenda - 08-20-2002 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-20-2002
>
Agenda - 08-20-2002 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:20:54 PM
Creation date
8/29/2008 10:50:59 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> Mary Haith <br /> 8809 Harmony Church Rd. <br /> Mebane,NC 27302 <br /> 4/2/02 <br /> EXTERIOR: <br /> 1. Cover all door and window frames with white coil stock. <br /> 2. Remove all old gutters from boxing.Drill 3/4'holes between rafters <br /> to allow air into the attic. Install vented soffit on all overhangs. <br /> 3. Cover all facias, eves and overhangs with white coil stock. <br /> Cover the front and side porch ceilings with white solid soffit. <br /> Nail 1x4 inch lumber across ceiling joists on the side porch to <br /> receive the solid soffit. Wrap all exposed wood on the exterior. <br /> 4. Install continuous aluminum gutters and downspouts. Install splash <br /> blocks under each downspout. <br /> 5. Install ten(10) automatic foundation vents around the perimeter of the <br /> foundation... <br /> 6. Repair the left front porch foundation wall. Use mortar to fill in the <br /> damaged area. Stucco the entire foundation with block bond foundation <br /> mix.Use an off white color. <br /> 7. Prime and paint the two (2) access doors and frame. Use semigloss <br /> latex paint.Paint to cover completely. <br /> 8. Replace the old wooden tree posts on the side porch. Install new treated <br /> 6 x 6 posts.Pour a 24"x 24"x 10"pier footing for the comer post. <br /> Prime and paint the 6 x 6 posts with white exterior latex paint. <br /> 9. Install a shingle type ridge ventilation system on the main roof only. <br /> Cut a 2 3/s- 3 inch section from the ridge and install the ridge vent. <br /> WINDOWS: <br /> 1. Install 8 insulated vinyl replacement windows on the l'and 2"4 floor. <br /> The windows shall have at least one openable sash, screen,window lock <br /> and trim. The trim color shall match the windows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.