Orange County NC Website
12 <br /> Cheryl Mitchell <br /> 112 Eugene St. <br /> 02/01/02 <br /> 928-9912 <br /> 3. Install pressure treated 2x8x8 at the center of each set of joists. <br /> 4. Anchor the deck to the house with 5/8 inch galvanized bolts. <br /> 5. Install a 2x10 band on the deck with 5/8 inch galvanized bolts. <br /> 6. Install 4x4 decorative posts, 2x4 rails and 2x2-scalloped pickets. <br /> 7. Install a 4x4-foot landing on concrete footers on the right hand side of the deck. <br /> Install steps,rails and pickets to match the deck. <br /> ROOF: <br /> 1. Remove the shingles to the sheathing. Install I51b. felt,three tab, fiberglass <br /> shingles,new plumbing boots and aluminum drip edge. Install flashing and <br /> counter flashing on the chimney. <br /> 2. Replace approx. 64 sq.ft. of sheathing. <br /> INTERIOR: <br /> Living Room: <br /> 1. Remove the front door.Reinstall the door unit properly. Install a deadbolt to be <br /> keyed the same as the lockset. Install a wide view peephole. Paint the door and <br /> door frame with exterior, semigloss latex paint. Paint to cover completely. <br /> 2. Install an aluminum over wood storm door with pneumatic closure and vinyl <br /> sweep. Door to have self-storing glass and screen,push button lock,key and a <br /> lifetime warranty. <br />