Browse
Search
Agenda - 09-02-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-02-2003
>
Agenda - 09-02-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:24:02 PM
Creation date
8/29/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030902
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />Sam English <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />BATHROOM: <br />Page 6 <br />1. Prepare the walls and ceiling for paint. Clean the walls and ceiling with <br />a 50/50 water and bleach solution. Prime the walls and ceiling with an <br />oil based primer. Paint the walls and ceiling with semigloss latex paint. <br />The paint shall cover completely. <br />2. Prepare the trim and door for paint. Prime the trim and door with <br />an oil based primer. Paint the trim and door with semigloss latex <br />paint. The paint shall cover completely. <br />3. Install a new tub/shower surround. Remove the faucet handles to <br />install the new surround. Install new molding to cap off the top and sides. <br />Install new casing around the window. Prime and paint the window, <br />casing and new trim with semigloss latex paint. The paint shall <br />cover completely. <br />4. Install a new flush door on the linen closet. Prime and paint the <br />door with semigloss latex paint. The paint shall cover completely. <br />Install a passage lockset on the door. <br />5. Install a new handicap commode, supply line & cutoff. <br />BASEMENT: <br />1. Paint the walls and ceiling in the stairway. Prime the walls with a bonding <br />type primer. Paint the walls & ceiling with at least two (2) coats <br />of flat latex paint. The paint shall cover completely. <br />2. <br />Install a new 32 inch insulated door unit in the basement. (out-swing) <br />The new unit shall have a keyed lockset, weatherstripping and threshold. <br />Paint the door & interior jamb with semigloss latex paint. Install interior <br />casing & jamb extensions and paint with semigloss latex paint. <br />The paint shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.