Browse
Search
Agenda - 09-02-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-02-2003
>
Agenda - 09-02-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:24:02 PM
Creation date
8/29/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030902
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Sam English <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />DEN: <br />1. Prepare the walls and ceiling for paint. Fill all damaged seams, <br />joints and nail holes with sheetrock filler. Paint the walls with <br />flat latex paint. The paint shall cover completely. <br />2. Prepare the trim for paint. Fill all nail holes. Caulk all cracks <br />and joints with latex caulk. Paint the trim with semigloss latex <br />paint. The paint shall cover completely. <br />3. Prime and spray a texture on the ceiling. <br />HALLWAY: <br />Prepare the walls for paint. Fill all damaged seams, joints and nail <br />holes with sheetrock filler. Paint the walls with flat latex paint. The <br />paint shall cover completely. <br />2. Prepare the ceiling for a sprayed texture. Repair all seams, nail holes, <br />and tape joints with sheetrock filler. Sand all new filler and spray a <br />texture on the ceiling. <br />3. Remove the wood stove. Repair the sheetrock where the vent flue <br />enters the chimney. Install'/z sheetrock and finish smooth. <br />4. Adjust the door leading to the basement. Install casing on the base- <br />ment side. Install weatherstripping and a threshold. Trim the door <br />to close properly. <br />Page 4 <br />5. Paint the doors & trim with semigloss latex paint. The paint shall <br />cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.