Browse
Search
Agenda - 09-02-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-02-2003
>
Agenda - 09-02-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:24:02 PM
Creation date
8/29/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030902
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Sam English <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />ROOF: <br />1. Install a new 25 year 3 tab shingle roof. Install white eve starter and <br />15 lb felt paper. Remove and patch the two round vents on the rear <br />section. Install matching framing and sheathing. _ <br />2. Install new galvanized flashing on the brick chimney. Install step <br />and counter flashing. Install new vent boots on all plumbing vents. <br />3. Install a shingle type ridge vent on the main ridge. Remove a three <br />(3) inch section from the ridge. <br />4. Reinstall the lighten rod on the ridge. <br />WINDOWS: <br />1. Install 16 vinyl insulated replacement windows with screen and trim <br />throughout the entire unit. The windows shall have at least one <br />openable sash. Install and paint any necessary trim on the interior. _ <br />INSULATION: <br />Page 2 <br />1. Install R-19 insulation in the crawlspace & basement ceiling. <br />2. Add insulation to the attic to achieve an R-30 rating. <br />3. Install a 6 mil vapor barrier in the crawlspace. <br />INTERIOR: <br />LIVING ROOM: <br />1. Prepare the ceiling for a sprayed texture. Repair all tape joints, seams <br />and holes with sheetrock filler. Spray a texture on the ceiling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.