Browse
Search
Agenda - 09-02-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-02-2003
>
Agenda - 09-02-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:24:02 PM
Creation date
8/29/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030902
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Page 1 <br />Sam English <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />EXTERIOR: <br />1. Cover all wood door and window frames with white coil stock. <br />This includes all new and existing door and window frames. <br />2. Repair 24ft of damaged gutter board. Prime the new wood with <br />an oil based primer. Use fur, cedar or yellow pine material. <br />3. Install vented soffit in all overhangs. Wrap the fascias, eves & <br />freeze board with white coil stock. <br />4. Scrape, prime and paint the garage door. Install coil stock on the <br />jamb. Paint the garage door with semigloss latex paint. The paint <br />shall cover completely. Install safety glass in the openings. Install <br />window stop around the glass on the interior. <br />$. Install two (2) access doors and frames below the side porch & on the <br />right/front foundation wall. Use treated lumber for the door and frame. <br />Install a 2x6 frame and 3/a" treated plywood for the door. Install hinges <br />and locking hasp. Prime and paint the door and frame with semigloss <br />latex paint. The paint shall cover completely. <br />(. Remove all loose mortar and damaged brick from both sets of <br />steps. Re-lay all missing brick. Re-point all missing mortar on <br />both sets of steps. Clean the steps with muriatic acid after 14 days. <br />7. Install'/4" foam insulation and D-5 vinyl siding on the side porch. <br />8. Install continuous aluminum gutters and downspouts. Install splash <br />blocks under each downspout. Install gutters on all fascias.. <br />9. Remove the front storm door and door unit. Install a new 36" metal <br />insulated door unit. The door unit shall have an aluminum threshold <br />and weatherstripping. Install an entry lockset and deadbolt keyed alike. <br />Install a wide view door viewer. Install matching casing on the interior. <br />Prime and paint the new casing with semigloss latex paint. The paint <br />shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.