Browse
Search
Agenda - 09-02-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 09-02-2003
>
Agenda - 09-02-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:24:02 PM
Creation date
8/29/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030902
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Sam English <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />ELECTRICAL: <br />1. Install a new 200 amp service. Install a new mast, weather head <br />& meter base. <br />2. Install two GFI receptacles and circuits in the kitchen. <br />3. Install one GFI receptacle and circuit in the bathroom. <br />4. Install an arc fault interrupter on each bedroom circuit. <br />5. Install electric smoke detectors with battery back-up in all sleeping <br />rooms. Install one located in the hallway and one located in the <br />stair-well located in the basement. A total of five (5) smoke <br />detectors. Install smoke detectors per code. <br />6. Install a vent less range hood over the oven in the kitchen. <br />Secure the vent hood to the cabinet. <br />Page 8 <br />7. Install a new wall switch & plate in the bathroom. <br />8. Install three (3) Eft florescent lights in the basement. <br />All connections must be in a junction box/cover. <br />9. Install covers on all junction boxes in the basement. <br />10 Install 3 missing receptacle/switch plate covers in the basement. <br />11. Install aflood/motion light over the basement door. <br />12. Install a switch and circuit for a light fixture in the staircase opening. <br />Install a new light fixture. _ <br />13. Secure all loose wire to the floor joists. Place all wire in conduit <br />that is attached to the basement wall. <br />14. Install a new circuit to the freezer located in the basement. <br />Place the wire in conduit and install a new receptacle and box. <br />
The URL can be used to link to this page
Your browser does not support the video tag.