Browse
Search
Agenda - 08-25-2003-c4a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-25-2003
>
Agenda - 08-25-2003-c4a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:16:41 PM
Creation date
8/29/2008 10:50:18 AM
Metadata
Fields
Template:
BOCC
Date
8/25/2003
Document Type
Agenda
Agenda Item
c4a
Document Relationships
Minutes - 20030825
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-110 Amendment to the Land Use Element - Orange County Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~9~6 <br />GOAL 3 - DEVELOPMENT PATTERNS <br />Within the County•s planning jurisdiction, establish <br />development patterns compatible with the goal of directing <br />urban growth to areas where it is desirable and can be <br />practically and efficiently served by water and sewer <br />facilities. <br />A. General Policies <br />1. Public water and sewer facilities should be <br />extended in accordance with the Land Use Element of <br />.the Orange County Comprehensive Plan. Such <br />facilities will be encouraged, where they are <br />available, in the Plan's Urban and Transition <br />areas, and will be discouraged in Rural and <br />Agricultural areas except where their provision <br />will enhance the rural character and provide for <br />open space by allowing clustered development. <br />2. Joint planning should be developed and implemented <br />among the County, its municipalities, surrounding <br />jurisdictions, and utility providers responsible <br />for water and sewer service to guide the extension <br />of lines in accordance with joint land use plans <br />and water/sewer_service boundary agreements. <br />8. Service Capability/Cpacity/Extension;Policies <br />1. A water or sewer system built or extended within a <br />Transition area as defined in the Land Use Element <br />of the Orange County Comprehensive Plan shall be <br />designed, sized, and constructed to the standards <br />of the probable future public utility provider. <br />The location and size of utility easements shall be <br />approved by and dedicated in the form of a deed of <br />easement to the probable future public utility <br />provider. <br />2. A development project to be served by a public <br />or private water or sewer system must be assured of <br />installation of such service at the time it is <br />approved. <br />"Assured of installation" shall mean that the <br />municipality, private association or water or <br />sewer authority to whose system the development <br />project is to be connected has reviewed and <br />approved preliminary plans for proposed water <br />and sewer lines, the adequacy of the existing <br />system(s) to which the connection(s) will be made, <br />the capacity of existing water and sewer treatment <br />facilities, the carrying capacity of the discharge <br />stream or discharge point, and the method of <br />funding proposed extensions of water and sewer <br />lines. The approval by the municipality, private <br />association, or water or sewer authority shall <br />contain a certification that service to the <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.