Browse
Search
Agenda - 08-25-2003-c4a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-25-2003
>
Agenda - 08-25-2003-c4a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:16:41 PM
Creation date
8/29/2008 10:50:18 AM
Metadata
Fields
Template:
BOCC
Date
8/25/2003
Document Type
Agenda
Agenda Item
c4a
Document Relationships
Minutes - 20030825
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-110 Amendment to the Land Use Element - Orange County Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 Q ~ <br />Excerpt from Section 2.3, Water Resources, of the Land Use Element- <br />Orange County Comprehensive Plan <br />The Long Ranae Water Management Strategy Committee had a different task, <br />recommending the management strategy and financing option best able to <br />supply Orange County with an adequate supply of water. The Committee also <br />reviewed best supply options and, while agreement was not universal, leaned <br />towards a new reservoir in Orange County as the best long-term source with <br />Jordan Lake being pursued as a parallel option. <br />The Committee agreed that the status quo was unacceptable, although no <br />consensus was reached on an end water management structure. Because the <br />Committee concluded that there were desirable benefits to a consolidated water <br />and sewer entity, however, members chose to recommend incremental action as <br />a first step towards meeting the long-range water needs of Orange County. To <br />this end, the Committee recommended the creation of an Orange County Water <br />Board, to be invested with five initial charges; <br />1) Pursue an allocation from Jordan Lake on behalf of the County and its <br />water providers; <br />2) Pursue an inter-local agreements with water providers in Alamance <br />County; <br />3) Work with the County's consulting engineers on Phase II of the Orange <br />County Water Supply study, which would focus on more precise <br />engineering and cost data for the water supply options recommended <br />in the Orange County Water Supply Study, Phase I, released in <br />November 1987; <br />4) Work cooperatively with the various water and sewer service providers <br />and municipalities in the County, including Mebane and Durham, to <br />identify and develop a joint agreement on service area boundaries <br />(a task force composed of elected officials and staff from Orange <br />County, Chapel Hill, Carrboro, Hillsborough, and OWASA <br />developed over a period of seven nears, a Water and Sewer <br />Management, Planning and Boundary Agreement and Map that <br />depicts primary service areas and long-term interest areas. The <br />Board of Countv Commissioners adopted the agreement m its <br />final form on December 3, 2001 The Agreement and Map are <br />incorporated as Appendix G to this plan); and„ <br />5) Develop a water conservation program for all of Orange County. <br />With the exception of the first charge, which was constrained by external time <br />limits, no priorities were attached to these responsibilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.