Browse
Search
Agenda - 08-25-2003-c4a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-25-2003
>
Agenda - 08-25-2003-c4a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:16:41 PM
Creation date
8/29/2008 10:50:18 AM
Metadata
Fields
Template:
BOCC
Date
8/25/2003
Document Type
Agenda
Agenda Item
c4a
Document Relationships
Minutes - 20030825
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-110 Amendment to the Land Use Element - Orange County Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~t <br />E. Siting of Essential Public Facilities Within Interest Areas <br />The location of some essential public facilities, particularly <br />schools, requires special consideration for access to public <br />water and sewer lines. <br />Where possible, schools shall be sited in a manner that <br />promotes the efficient use of existing water and sewer service. <br />Preferably, a set of criteria governing such situations would be <br />developed based on consultations between the appropriate <br />school boards and the elected officials of affected jurisdictions, <br />and applied as necessary. <br />Publicly-owned facilities .other than a public school shall be <br />located in a -manner that promotes---the. orderly provision of <br />water and sewer service: The preferred method of connection. is <br />to lines that _already exist, or in a manner. that would minimize <br />the need to extend existing lines. <br />F. Water and Sewer Service Into/Out of Orange County <br />Water and sewer service of any of the service providers that are <br />parties to this agreement shall not be extended outside of the <br />boundaries of Orange County without the approval of the elected <br />boards which exercise planning jurisdiction on either side of the <br />County boundary. Any extension of lines or service into Chatham <br />County requires the approval of Orange County, Chapel Hill or <br />Carrboro, and OWASA. This approval is not required when <br />water~and sewer service is required as a condition of annexation <br />by the towns of Chapel Hill or Carrboro. <br />Vlf. WATER TRANSFERS AND WASTEWATER TRANSFERS <br />A. Emergency Water'Transfers (This subsection shall not apply <br />to any system operated by a municipality) <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.