Browse
Search
Agenda - 10-17-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 10-17-2005
>
Agenda - 10-17-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 9:46:31 AM
Creation date
8/29/2008 10:50:12 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20051017
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />development of Site Plan B would likely cause the County to re -think the use of <br />the building for the Parks Operations Base purposes due to cost of the <br />construction of the access road. <br />An evaluation team consisting of a building inspector, fire marshal and staff <br />representatives from Public Works, Planning, Purchasing and Engineering has <br />conducted a site visit to assess the current structure on Valley Forge Road facility. <br />Their findings will be presented during the worksession on October 17, 2005. <br />Orange Enterprises, the current occupant of the building, will be moving to their <br />new location by January 2006, thereby clearing the way for the County to <br />implement whatever plans we deem appropriate regarding the use of this <br />building. Based on information provided herein and during the worksession, the <br />Board may wish to explore options that include, but are not limited to, whether <br />the County should: <br />• Option is Renovate the building and site to accommodate the Parks <br />Operations Base /Parks Administration; <br />o If renovations are to occur, recommend which site plan <br />should be used as the basis for design; <br />• Option 2: Not renovate the building to accommodate the Parks <br />Operations Base /Parks Administration <br />• If no renovation is to occur, discuss the advisability of <br />building a structure for the parks operations base <br />somewhere in the vicinity of the Public Works /Fairview Park <br />site; or <br />• In the alternative, continue to lease the existing parks <br />operations base until such time the appropriate facilities are <br />constructed at the Blackwood Farm as a permanent location <br />of the operations base. The current annual lease for the <br />parks operations base is $33,000. <br />• Option 3: Consider relocating other County offices to the building. <br />Outstanding issues that have arisen since the publication of the 2004 <br />Facilities Study Update and that potentially could be addressed at this <br />facility include: <br />• Board of Elections need for additional office space and <br />storage for equipment, ballots, etc. <br />• Expansion of Farm Services Agency (FSA), presently located <br />at the Planning and Agriculture Building. (Note: Relocating <br />FSA to this facility should likely also include the relocation of <br />all other agriculture related functions in the Planning and <br />Agriculture Building in order to maintain effective <br />collaboration among the departments.) <br />• Option 4: Consider marketing the building for sale. FYI, the current <br />tax value according to the Tax Assessor's office is $291,877 <br />Storage Facility Acquisition <br />
The URL can be used to link to this page
Your browser does not support the video tag.