Orange County NC Website
n'~ ~ '~ Ordinance to Public Hearing <br />Erosion and Sediment Control Ordinance and <br />Manual; <br />2) Construction is phased to the extent practical to <br />minimize disturbance and sedimentation; <br />3) Sediment control measures will be properly <br />installed to filter sediment from runoff during <br />construction and maintained until grading is <br />complete and a permanent vegetative cover has <br />been established and all slopes stabilized; and <br />4) Permanent landscaping, groundcover, mulch, <br />etc. will be installed as soon as practical after <br />construction activities for each phase are <br />completed. <br />h) Solid Waste Management <br />The Solid Waste Management Plan submitted as part of <br />the Resources Management Plan shall include the <br />._ method(s) of disposal end _.recycling of construction <br />debris. <br />i) Irrigation <br />1) Irrigation systems for the subdivision and the <br />lots in the subdivision are designed and can be <br />operated according to a water conservation plan <br />described in the Resources Management Plan <br />submitted with the application; <br />2) The Resources Management Plan shall identify <br />the source(s) of water to be used for irrigation, <br />the volume available for that purpose, and <br />expected consumption rates. The system design <br />and plan for operation will be evaluated based <br />on efficiency; and <br />3) Water recycled from stormwater retention <br />ponds or treated sewage effluent maybe used for <br />irrigation where it is a legally permitted <br />alternative. <br />j) Habitat Maintenance <br />g:currentplanning/Robert/majorsubdivisionSUPOnIyvith Headings <br />