Browse
Search
Agenda - 08-25-2003-c1ab
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-25-2003
>
Agenda - 08-25-2003-c1ab
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:18:32 PM
Creation date
8/29/2008 10:50:11 AM
Metadata
Fields
Template:
BOCC
Date
8/25/2003
Document Type
Agenda
Agenda Item
c1ab
Document Relationships
Minutes - 20030825
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-107 Concurrent Amendments to Orange County Zoning Ordinance and Orange County Subdivision Regulations Regarding Subdivision Size, Location, Process, and Standards
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cren~neQnc f:R[1WTH MONAGEMENT SYSTEM <br />... <br />R-1 & EDD ZONING IN WATER~SEWER BOUNDARY URBANIZING TAN <br /> SUBDMSION. MAJOR SUP I SUP II PD <br /> Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING 7URISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br /> SUBDMSION MAJOR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />4. Permanent landscaping, groundcover, <br />mulch, etc. will be installed as soon as <br />practical after construction activities <br />for each phase are completed. <br />H. Solid Waste Management <br />The Solid Waste Management Plan <br />submitted as part of the Resources <br />Management Plan shall include the <br />method(s) of disposal and recycling of <br />construction debris. <br />I. Irrigation <br />1. Irrigation systems for the subdivision <br />and the lots in the subdivision are <br />designed -and can be, ~: operated _: - <br />according to a water conservation -plan- __ <br />described in the Resources <br />- Management Plan submitted with the <br />application; <br />2. The Resources Management Plan shall <br />identify the source(s) of water to be <br />used for irrigation, the volume <br />available for that purpose, and <br />expected consumption rates. The <br />system design and plan for operation <br />will be evaluated based on efficiency; <br />and <br />3. Water recycled from stormwater <br />retention ponds or treated sewage <br />effluent is used for irrigation where it is <br />a legally permitted alternative. <br />I R = Recortimended/ <br />~, ;Required - .`` GS^=Goal Supporting E = Existirig Per-Non-SUP 5ubdivtsiori Regulations" " <br />Lever (Analysis` C = comment _ - NIA =Not P.pp7i~ble <br />Level 1l Anal sis <br />
The URL can be used to link to this page
Your browser does not support the video tag.