Orange County NC Website
~~ <br />STANDARDS. GROWTH MANAGEMENT SYSTEM <br />R-1 & EDD ZONING IN WATER/SEWER BOUNDARY URBANIZING TAN <br /> SUBDMSION MAJOR SUP I SUP II PD <br />Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING .7URISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br /> SUBDMSION MAJOR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />d. Trees and stumps cleared for roads <br />and building construction shall <br />either be used for timber purposes <br />or shredded for landscape mulch, <br />composted, buried or otherwise R R R R <br />disposed of BUT NOT BURNED. I I II II <br />2. Berms, fences and landscaping walls <br />may be used with plant materials for <br />screening, provided such features are <br />designed and located in harmony with <br />other site features and functions; <br />3. Use of xeriscaping principles. <br />E. Stormwater Management <br />1. No net increase in peak=flow leaving _ .; <br />- -- ~ the site fram the predevelopment <br />conditions for the 1 year, 24-hour R R R R <br />storm; I I II II <br />2. The stormwater management system <br />must respect existing drainage <br />patterns. Runoff shall be directed <br />away from erosion-prone slopes. <br />Paved paths may be used to channel R R R R <br />runoff; I I I I I I <br />3. Energy dissipaters such as riprap <br />aprons shall be used where runoff is <br />concentrated and discharged, for <br />example, at downspouts from rooftops <br />and storm drains at parking areas. <br />Runoff shall not be discharged directly <br />into surface water, or other R R R R <br />environmental) sensitive areas; I I II II <br />R ='.Recommended/_ , .; , _ <br />4~equired~ GS =Goal Supporting E =Existing Per Non-SUP Subdivision Regulations <br />Level I Analysis C-=.Comment NIA =Not Applicable <br />Level Il Anal sis <br />