Browse
Search
Agenda - 08-19-2003-ws1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-19-2003
>
Agenda - 08-19-2003-ws1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:14:21 PM
Creation date
8/29/2008 10:50:01 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Document Type
Agenda
Agenda Item
ws1
Document Relationships
Minutes - 20030819
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-104 - Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cTeNneRnc_ rRnWTH MANAGEMENT SYSTEM 18 <br />R-1 & EDD ZONING IN WATER/SEWER BOUNDARY URBANIZING TAN <br /> SUBDIVISION MAJOR SUP I SUP II PD <br /> Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING ]URISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br /> SUBDIVISION MAJOR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />4. Concentrated stormwater, conveyed by <br />ditches, channels, pipes, swales or <br />other conveyance systems must be <br />dispersed and diffuse flow <br />reestablished prior to discharge into a R R R R <br />stream buffer; I I II II <br />5. Nitrogen load contribution must be R R R R <br />held to 3.6 Ibs per acre per year. I I II II <br />F. Drainage <br />1. All drainage structures will be installed <br />and maintained according to the <br />approved stormwater Management R R R R <br />Plan. I I II II <br />2. Subdivisions that include <br />retention/detention ponds shall comply <br />with the requirements in Section 6.23.4, <br />Operation and Maintenance of R R R R <br />Structural Best Management Practices. I I II II <br />G. Grading and Erosion Control <br />1. Plans for grading and erosion control <br />comply with standards contained in the <br />Orange County Erosion and Sediment R R R R <br />Control Ordinance and Manual; I I II II <br />2. Construction is phased to the extent <br />practical to minimize disturbance and <br />sedimentation; <br />3. Sediment control measures will be <br />properly installed to filter sediment <br />from runoff during construction and <br />maintained until grading is complete <br />and a permanent vegetative cover has <br />been established and all slopes . <br />stabilized; and <br />R =Recommended/ <br />Required GS =Goal Supporting E =Existing Per Non-SUP Subdivision Regulations <br />Level I Analysis C =Comment N/A =Not Applicable <br />Level II Anal sis <br />
The URL can be used to link to this page
Your browser does not support the video tag.