Browse
Search
Agenda - 08-19-2003-9A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 08-19-2003
>
Agenda - 08-19-2003-9A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:14:37 PM
Creation date
8/29/2008 10:49:55 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Document Type
Agenda
Agenda Item
9A
Document Relationships
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030819
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document Page 6 of 8 <br />~~ <br />• Recycle or salvage at least 50% of construction and demolition debris by weight <br />5.4 Resource Reuse <br />• Specify salvaged or refurbished materials for a minimum of 2% of the building materials excluding <br />furniture, fixtures and equipment <br />5.5 Recycled Content <br />• Specify that a minimum of 20% of building and site materials contain an aggregate average of 20% <br />post-consumer content or 40% post industrial content <br />5.6 Local Materials <br />• Specify that a minimum of 20% of building and site materials are manufactured regionally within a <br />500 mile radius <br />5.9 Durable Materials <br />• Review materials used in the building for durability to ensure appropriate life cycle costs for roofs, <br />HVAC, structure systems, finishes, furniture, fixtures and equipment <br />lndoor Environment <br />6.1 Minimum Indoor Air Quality <br />• Meet the minimum requirements of standard ASHRAE 62-1999, Ventilation for Acceptable <br />Indoor Air Quality <br />• Explore installation of CO monitoring systems if called for <br />6.2 Tobacco Smoke Control <br />• All guidelines met <br />6.3 CO2 Monitoring <br />• Install a permanent CO2 monitoring system with a concentration towards high occupancy areas <br />with parameters set at no more than 530 parts per million when compared to outside air or 1,000 parts <br />per million for indoor air <br />6.4 Ventilation Effectiveness <br />• For mechanically ventilated buildings, design systems that result in air exchange effectiveness <br />greater than 0.9 as determined by ASHRAE 129-1997 <br />• In building renovations, continue the same exchange effectiveness <br />6.5 Construction IAQ Management <br />• During construction, meet SMACNA IAQ guidelines and protect stored on-site or installed <br />absorptive materials from moisture damage <br />• Replace air filters regularly to maintain system cleanliness during construction and just before <br />occupancy <br />http://nt5.scbbs.com/cgi-bin/om_isapi.dll?clientID=546502&depth=2&infobase=chaphill.n... 8/ 11 /2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.