Browse
Search
Agenda - 06-26-2003-8G
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 06-26-2003
>
Agenda - 06-26-2003-8G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:06:29 PM
Creation date
8/29/2008 10:48:40 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2003
Document Type
Agenda
Agenda Item
8G
Document Relationships
Minutes - 20030626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 26, 2003 <br />Action Agenda <br />Item No. <br />SUBJECT• Authorization to Contract for Work at Whitted Building During Summer Break <br />DEPARTMENT: Purchasing and Central <br />Services & Public Works <br />PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />INFORMATION CONTACT: <br />Pam Jones, (919) 245-2652 <br />Wilbert McAdoo, (919) 245-2625 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane 336-227-2031 <br />PURPOSE: To consider authorizing the Manager or his designee to contract with vendors <br />during the summer break for materials and labor associated with painting the interior of the <br />facility and replacing floor covering when that work exceeds the $20,000 threshold for Board <br />approval. <br />BACKGROUND: As the Board will recall, work at the Whitted Building was suspended in early <br />May 2003 in order to remove bat guano in above ceiling areas of the building that would need to <br />be accessed for installation of new HVAC ductwork. The abatement contractor is progressing <br />well with the basement level now completed and completion of the full abatement project <br />anticipated by June 27, 2003. After suspending the job for approximately four weeks pending <br />completion of the abatement in specific work areas, both the HVAC and the electrical <br />contractors returned to the project on June 2, 2003. <br />The Whiffed Building work basically runs on two parallel tracks. One track is the HVAC <br />renovation, which is under contract with Environmental Air Systems (EAS), and the other the <br />more cosmetic renovations of painting and replacing floor covering that is being coordinated by <br />the Public Works Department under separate contracts. Pubic Works is coordinating the work <br />such that the flooring/painting work is accomplished as the HVAC contractors complete a <br />section and move to the next. In order to maintain the continuity of the project and to ensure <br />the December completion time is met, certain work must be accomplished during the period that <br />the Board is not in session (July 1 through August 19). Although each of the components will <br />be bid as required, the flooring and painting bid amounts will fall into a range normally requiring <br />Board approval (over $20,000). The Board is being asked to authorize the Manager or his <br />designee to execute the paperwork necessary to place this work under contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.