Browse
Search
Agenda - 06-17-2003-8u
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 06-17-2003
>
Agenda - 06-17-2003-8u
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:38:19 PM
Creation date
8/29/2008 10:48:02 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2003
Document Type
Agenda
Agenda Item
8u
Document Relationships
2003 NS Co Engineer - Electrical Easement for Norfolk-Southern Railway Signal Light
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030617
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Underground Distribution Installation Plan (NC & SC) Continued) <br />10. The Company will make, or adjust, charges to the owner to collect the actual additional costs to the Company <br />due to adverse conditions, such as: the composition of the land where the underground facilities are to be <br />installed is such that standard construction equipment cannot be used to complete the installation; or, special <br />equipment and materials are needed for stream crossing structures or concrete structures; or, dynamite is <br />required; or, if abrupt changes in final grade levels exceed a slope ratio of 1 when measured within three feet of <br />the trench. <br />I1 The Company's agreement to provide underground service is dependent upon the securing of all necessary <br />rights, easements, rights-of--way, privileges, franchises or permits for the installation of such service from those <br />requesting the underground facilities. The Company shall exercise care in the utilization of its underground <br />equipment during construction, but the ultimate responsibility for the protection of shrubs, trees, and grass sod <br />will be with the owner. Shrubs, trees, or any other obstacle shall not be placed within ten feet of transformer or <br />cabinet openings which would hinder the access of the Company at any time. <br />12. Temporary service will not be available in the area served from underground facilities until the underground <br />system is in place unless the owner elects to pay the "in and out" costs of temporary facilities necessary to <br />deliver the temporary service from overhead distribution lines. After the underground facilities are in place, <br />temporary service maybe provided for no charge only at a transformer or pedestal location. <br />13. Underground conductors to provide service to Company-owned outdoor lighting will be furnished under the <br />applicable rate schedule on file with and approved by the Commission. <br />14. The Company will provide and coordinate underground service facilities with other requested facilities which are <br />supplied under the Extra Facilities provision of the Company's Service Regulations. <br />Effective December 21, 1994 <br />NCUC Docket No. E-7, Sub 552 <br />Effective January 1, 1995 <br />SCPSC Docket No. 94-765-E <br />Order No. 94-1306 <br />(Page 4 of 4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.