Orange County NC Website
9 Orange County Comprehensive Land Use Plan <br /> <br />Con�ngency Mee�ngs with Board of Commissioners (2) <br />Two addi�onal mee�ngs with the Board of Commissioners are included as part of a con�ngency budget of mee�ngs that can be used as needed <br />during the project. The first con�ngency mee�ng was conducted on November 2023. This was the #2 briefing to the Board of County <br />Commissioners. The second con�ngency mee�ng occurred March of 2025 (briefing #7) to share the public review dra� of the plan with the Board. <br /> <br /> <br /> <br />Docusign Envelope ID: 875C5B7A-C59F-8644-83AF-A22B12F5CE79