Orange County NC Website
Docusign Envelope ID : 44C13555-A1DE-83DE-8008- D9A38861DC35 �� Cu� lh � �jj ) ) S Is I <br /> J <br /> [ Departmental Use Only] <br /> TITLE SHSC Solar <br /> FY 2025-2026 005478 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $ 2509000. 00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement") , made as of the 8th day of <br /> May, 2026 , by and between 8Msolar LLC , (hereinafter called the "Contractor") , and Orange County, a <br /> political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County, " or <br /> "Owner") . <br /> WITNESSETH , <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows : <br /> 1 . CONTRACT DOCUMENTS ; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement , the Request for Proposals, designer approved communications and field <br /> orders , the Proposal, Construction Documents and Drawings and Written Specifications . The Contract <br /> Documents form the Contract . In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority : <br /> a . This Agreement and incorporated General Conditions attached as Exhibit 1 . <br /> b . Designer approved and stamped construction documents and drawings and written <br /> specifications . <br /> c . Designer approved communications and field orders . <br /> d . Request for Proposals and addenda thereto . <br /> e . Proposal . <br /> 2 . SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials , and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice - to -Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents , <br /> which are made a part hereof as if fully contained herein : <br /> a . Constriction Drawings prepared by Pisgah Energy ( Sheet Bid Documents E-002 , E101 , E201 , <br /> E301 , E302 , PC- 1 , PG2 , PC-3 , PC4 , PG5 , PC-6 , PC-7 , PC- 8 , PC-9 , PC40 dated <br /> 02/ 16/2026) <br /> b . Written specifications prepared by the Designer . <br /> C . 8Msolar LLC proposal dated March 30 , 2026 which fully describes the work to be performed, <br /> Revised 01 / 24 1 <br />