Browse
Search
Agenda 06-16-2026; 8-j - Contract Renewal with Siemens for HVAC Controls and Building Automation Services for FY 2026-27
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-16-2026 Business Meeting
>
Agenda 06-16-2026; 8-j - Contract Renewal with Siemens for HVAC Controls and Building Automation Services for FY 2026-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 3:58:45 PM
Creation date
6/11/2026 4:01:16 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-j
Document Relationships
Agenda for June 16, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-16-2026 Business Meeting
ORD-2026-014-Fiscal Year 2026-27 Budget Ordinance Orange County, North Carolina
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-015-Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-016-Fiscal year 2025-26 budget amendement #12
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-017-Amendment to Professional Services Contract with Clarion Associates to Develop a Comprehensive Land Use Plan, and Approval ofbudget amendment 12
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
OTHER-2026-051- Approval of a Natural Resources Conservation Service (NRCS) Emergency Watershed Protection (EWP) Grant Award – Lake Orange Spillway Channel
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-057-JCPC Certification and County Plan for FY 2026-2027
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-058-FY 2028 Unified Grant Application Delegations of Authority and Title VI program reports
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-060-Attachment 3 NC DPS community County Funding Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
PRO-2026-031-A RESOLUTION TO CELEBRATE POLLINATOR WEEK IN ORANGE COUNTY
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-040-A Resolution Regarding the Use of Occupancy Tax for Tourism Related Expenditures
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-041- Resolution in Support of Tobacco 21 to Protect Youth from Vaping and Nicotine Addiction
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-042-A RESOLUTION BY THE COUNTY OF ORANGE, NORTH CAROLINA TO DIRECT THE EXPENDITURE OF OPIOID settlement funds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> SIEMENS <br /> Zone RX Reporting and Fault Resolution <br /> Building Zone Reporting —via ZoneRx <br /> ZoneRx is a report-based Energy Service that allows customers to evaluate the performance of their standard- <br /> application Siemens zone controllers (P1 or BACnet TECs and DXRs). This report will identify basic faults <br /> (failed terminal unit controller, room temperature deviation, VAV airflow deviation,valve control issues, <br /> etc.), prescribe recommended repairs and corrective actions for each identified fault, estimate energy and <br /> operational impact if identified issues are corrected, and track identified faults and resolutions from previous <br /> report iterations. Siemens will create a ZoneRx Report for Orange County on a semi-annual basis and will be <br /> the provided to the County to review and Siemens service technician team to be used to investigate and take <br /> corrective action through the Task-Based Services listed below. <br /> Quarterly Task-Based Services <br /> Quarterly System Improvement Support (4 days/year) —from ZoneRx Reports- Siemens will utilize an onsite <br /> technician to address and resolve faults identified through the semi-annual reports.The intent is to ensure <br /> that the most critical or frequent items that have been discovered during the analytics reports have dedicated <br /> hours available for a Siemens Technician to perform the corrections needed so the building automation <br /> system is operating at optimal conditions. <br /> Equipment Repair& Replacement—Time and Material <br /> Repair& Replacement Services. To reduce the effects of unbudgeted repairs, Siemens can provide labor <br /> and materials to repair or replace failed or worn components to maintain your equipment in peak operating <br /> condition. Components that are suspected of being faulty should be repaired or replaced in advance <br /> to minimize the occurrence of system interruptions. Equipment requiring attention will be brought to the <br /> owner's attention. Approved repairs can be performed on a time and material basis or through a formal <br /> proposal. <br /> Under this agreement we will provide repair& replacement services per our current time and material policy <br /> (see Appendix A). <br /> Page 10 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.