Orange County NC Website
5 <br /> Service Sites,Attachment B3 no later than <br /> November 1, 2026. <br /> Upon Passing of and offering Communication $200,000.00 <br /> services to all 105 locations listed as "Final <br /> Service Sites", Attachment B3 no later than <br /> November 1, 2026. <br /> 3. Replacement of Attachments A/A2&C/C2—Service Area Map&Construction Plan and Timeline <br /> Attachment A2 ("Revised Service Area Map") (having replaced Attachment A("Service Area Map")), and <br /> Attachment C2 ("Revised Construction Plan and Timeline") (having replaced Attachment C <br /> ("Construction Plan and Timeline")) shall be replaced in its entirety and in all instances by the new <br /> Attachment A3 ("Final Service Area Map"), and Attachment C3 ("Final Construction Plan and Timeline"). <br /> 4.Addition of Attachment B3—Final Mutually Agreed Service Sites <br /> There shall be a new Attachment B3 ("Final Mutually Agreed Service Sites") for the purposes of <br /> identifying the remaining locations to be served and marked by the revised payment milestones. Within <br /> the new Attachment B3 ("Final Mutually Agreed Service Sites"),there shall be two divisions of the <br /> addresses identified as "Polygon 82" and "Polygon 83" which shall be based upon the polygons depicted <br /> in the new Attachment A3 ("Final Service Area Map") and correspond to the revised disbursement <br /> schedule in Section 13. <br /> 5. Definitions <br /> The definition of"Location" in Section 3 Definitions shall be replaced with the following: <br /> • "Location" means the site of a potential or current Customer found in the Mutually Agreed <br /> Service Sites (Attachment B), the Remaining Mutually Agreed Service Sites (Attachment 132), or <br /> the Final Mutually Agreed Service Sites (Attachment 133). <br /> The definition of"Placing Conduit" shall be added to Section 3 Definitions as the following: <br /> • "Placing Conduit" means the all conduit have been placed in the ground, including all required <br /> bores,trenching activities, and conduit placement activities.To qualify as"Placing Conduit" it <br /> must have been installed in accordance with applicable engineering specifications and industry <br /> standards. Furthermore, such installation must have been certified by Provider and verified by <br /> County that the installed conduit is ready for subsequent fiber placement activities, subject only <br /> to routine testing, inspections, permitting closeout, or other activities that do not require <br /> additional conduit construction. <br /> 6. Network Description <br /> The Parties hereby agree to amend Section 6 of the ND Agreement to include 48 fiber distribution hubs, <br /> 750 miles of fiber, and no less than 5,964 locations along the route (the "Mutually Agreed Services <br /> Sites"). <br />