Browse
Search
Agenda 06-16-2026; 6-c - Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-16-2026 Business Meeting
>
Agenda 06-16-2026; 6-c - Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 3:52:17 PM
Creation date
6/11/2026 4:01:10 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for June 16, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-16-2026 Business Meeting
ORD-2026-014-Fiscal Year 2026-27 Budget Ordinance Orange County, North Carolina
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-015-Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-016-Fiscal year 2025-26 budget amendement #12
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
ORD-2026-017-Amendment to Professional Services Contract with Clarion Associates to Develop a Comprehensive Land Use Plan, and Approval ofbudget amendment 12
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2026
OTHER-2026-051- Approval of a Natural Resources Conservation Service (NRCS) Emergency Watershed Protection (EWP) Grant Award – Lake Orange Spillway Channel
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-057-JCPC Certification and County Plan for FY 2026-2027
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-058-FY 2028 Unified Grant Application Delegations of Authority and Title VI program reports
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
OTHER-2026-060-Attachment 3 NC DPS community County Funding Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2026
PRO-2026-031-A RESOLUTION TO CELEBRATE POLLINATOR WEEK IN ORANGE COUNTY
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-040-A Resolution Regarding the Use of Occupancy Tax for Tourism Related Expenditures
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-041- Resolution in Support of Tobacco 21 to Protect Youth from Vaping and Nicotine Addiction
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-042-A RESOLUTION BY THE COUNTY OF ORANGE, NORTH CAROLINA TO DIRECT THE EXPENDITURE OF OPIOID settlement funds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> Clarifications <br /> cost savings from any individual line item against possible overruns of any other line items. All items except Owner <br /> Allowances will reconcile to Construction Contingency. <br /> > Sales Tax is included. <br /> > Prevailing wages are excluded. <br /> > Escalation is excluded. <br /> > This GMP does not include costs for any third-party monitoring or adjacent properties and existing <br /> facilities and improvements. Any third-party testing or monitoring are assumed to be provided by <br /> Owner. <br /> > The Construction Schedule is based on current lead times on equipment/materials. If these lead times <br /> change, Gilbane will need the opportunity to seek alternate manufacturers or adjust project schedule <br /> accordingly. <br /> > A cost and resource loaded scheduled is excluded. All cost will be submitted and reviewed via an <br /> approved schedule of value with the monthly payment application. <br /> > Gilbane has excluded any Design Costs or Contract Administration Cost(Submittal Review, RFI's, Site <br /> Visits, etc.)for CPL, Timmons, and any other design consultants. <br /> > The GMP includes insurance requirements from Gilbane to the Owner per the Prime Contract. <br /> Insurance Requirements from Gilbane to its subcontractors are included in the GMP per the attached <br /> Trade Contractor Insurance Requirements Exhibit. <br /> > The GMP includes Builder's Risk insurance coverage by Gilbane. Builder's Risk Insurance coverage is <br /> not included by Gilbane's subcontractors. <br /> > The GMP does not include a minimum percentage of minority or small business participation. <br /> > The GMP includes clarifications from the Pre-Bid RFI Log attached below. <br /> > The GMP does not include providing identification cards/badges for Gilbane nor trade personnel while <br /> onsite. <br /> > The GMP does not include providing a fire proof safe, nor onsite physical copies of as-builts stored in <br /> the construction trailer. <br /> > The GMP assumes Overhead and Profit of change orders for Gilbane shall be as follows in addition to <br /> the allowable 15% markup of the subcontractor: <br /> a SDI @ 1.3%of the cost of work. <br /> o Insurance @ 1.25%of the overall cost of the change order. <br /> o P&P Bond @.6% of the overall cost of the change order. <br /> o Fee @3.75% of the overall cost of the change order. <br /> SITEWORK <br /> > The GMP assumes that all site and building components being demolished can be hauled away as <br /> standard construction waste. <br /> > The GMP includes an Owner Allowance for Rock Removal. <br /> > The GMP does not include removal of any contaminated soils or groundwater. <br /> > The GMP assumes all onsite material is suitable for construction use/backfill. <br /> > The GMP assumes screening of existing topsoil for use in landscape areas. <br /> Orange County Crisis Diversion <br /> 100%Design Development • <br />
The URL can be used to link to this page
Your browser does not support the video tag.